WELL · 42-273-01628 · DISTRICT 4

King Ranch Tijerina #J38

N

Kleberg County  · Vertical

King Ranch Tijerina #J38 (API 42-273-01628) is a former disposal or injection well in Kleberg County, last operated by Exxon Corp.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1979 and 1984, permitted to 7,234 ft.

Operator of record

Exxon Corp.

Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitExxon Corp.Jul 16, 1984
7,234
total depth, ft
2
permits on file
Jul 16, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245190-99RecompletionExxon Corp.Jul 13, 1984Jul 16, 1984Sep 6, 19847,234
43343-99OtherExxon Corp.Feb 28, 1979Feb 28, 1979—7,234

Perforations

Perforated and open-hole intervals.

FromToType
—7,072Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114088UIC PermitPlugged Apr 19, 19854,0003,0007,150–7,155

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27301628, documented in the API reference.