WELL · 42-273-30577 · DISTRICT 4
King Ranch Tijerina #A34
Kleberg County · Vertical
King Ranch Tijerina #A34 (API 42-273-30577) is a former disposal or injection well in Kleberg County, last operated by Exxon Corp.; its UIC permit is no longer active.
The RRC has issued 3 drilling permits between 1978 and 1983, permitted to 12,700 ft.
Operator of record
Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | EOG Resources, Inc.through Aug 2015 |
| Latest permit | Exxon Corp.Jun 10, 1983 |
- 12,700
- total depth, ft
- 3
- permits on file
- Jun 10, 1983
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 352K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Tijerina G-4-77704 | T-C-B (Vxbg Consolidated) | EOG Resources, Inc. | 1 | 0 | 352K | Jan 1993 – Nov 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Aug 2010
- 3EOG Resources, Inc.Feb 2013 → Aug 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 197921-99 | Recompletion | Exxon Corp. | Jun 10, 1983 | Jun 10, 1983 | — | 12,299 |
| 190180-99 | Recompletion | Exxon Corp. | Mar 25, 1983 | Mar 25, 1983 | — | 12,299 |
| 33520-99 | Drill | Exxon Corp. | Sep 26, 1978 | Sep 26, 1978 | — | 12,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-77704 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,542 | 9,545 | Perforated |
| 9,542 | 9,561 | Perforated |
| 9,550 | 9,552 | Perforated |
| 9,557 | 9,561 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,014 | 14.75 | 1,100 S |
| 10.75 | 2,015 | 14.75 | 1,100 sx |
| 7.625 | 8,363 | 9.875 | 950 S |
| 7.625 | 8,364 | 9.875 | 950 sx |
| 2.875 | 9,001 | — | — |
| 5.5 | 11,669 | 6.75 | 1,240 S |
| 5.5 | 11,670 | 6.75 | 1,240 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 3, 1994 | Aug 8, 1994 | — |
| 00 | Aug 13, 1984 | Aug 1, 1984 | — |
| 00 | Jan 12, 1984 | Aug 1, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-30577 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-30577 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000105866 | W-14 Disposal | Plugged Dec 16, 2025 | 7,500 | 2,500 | 5,000–7,000 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27330577, documented in the API reference.