WELL · 42-273-31208 · DISTRICT 4
King Ranch Stratton #T 41D
Kleberg County · Vertical
King Ranch Stratton #T 41D (API 42-273-31208) is a permitted well in Kleberg County filed by Eog Resources, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1977 and 2013, permitted to 7,500 ft.
Its 3 leases have reported 77.3K barrels of oil and 159K mcf of gas since January 1993, last reporting in May 2025. The leases carry 16 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,348 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | EOG Resources, Inc.through May 2019 |
| Latest permit | EOG Resources, Inc.Apr 4, 2013 |
- 7,500
- total depth, ft
- 2
- permits on file
- Apr 4, 2013
- last permit issued
- —
- completed
- 77.3K
- cumulative oil, bbl
- 159K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 16 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Stratton O-4-12617 | Stratton (Consolidated) | EOG Resources, Inc. | 13 | 22K | 98.5K | Nov 1996 – May 2025 |
| King Ranch Stratton O-4-8200 | Stratton (Austin, Upper,sw) | EOG Resources, Inc. | 2 | 55.3K | 60.2K | Jan 1993 – Apr 2024 |
| King Ranch-Stratton O-4-7496 | Stratton (L-12) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – Nov 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Nov 2005
- 3EOG Resources, Inc.Jun 2013 → May 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 759963-99 | Recompletion | EOG Resources, Inc. | Apr 3, 2013 | Apr 4, 2013 | — | 7,100 |
| 14662-99 | Drill | Exxon Corp. | Dec 27, 1977 | Dec 27, 1977 | May 15, 1978 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-7496 | — | — | — | — |
| — | — O-4-8200 | — | — | — | — |
| — | — O-4-12617 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,303 | 6,308 | Perforated |
| — | 6,968 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,573 | 12.25 | 625 S |
| 1.25 | 5,975 | — | — |
| 2.875 | 7,081 | — | — |
| 2.875 | 7,083 | 7.875 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 8, 1996 | Aug 28, 1979 | — |
| 00 | Jan 12, 1984 | Aug 28, 1979 | — |
| 00 | Jan 12, 1984 | Jul 11, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31208 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31208 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331208, documented in the API reference.