WELL · 42-273-31349 · DISTRICT 4
King Ranch Alazan #334
Kleberg County · Vertical
King Ranch Alazan #334 (API 42-273-31349) is a permitted well in Kleberg County filed by Exxon Corp.; no completion report is on file yet.
The RRC has issued 5 drilling permits between 1979 and 1993, permitted to 9,900 ft.
Its 2 leases have reported 116K barrels of oil and 176K mcf of gas since January 1993, last reporting in June 1998. The leases carry 35 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Exxon Corp.through Jun 1997 |
| Latest permit | Exxon Corp.Apr 22, 1993 |
- 9,900
- total depth, ft
- 5
- permits on file
- Apr 22, 1993
- last permit issued
- —
- completed
- 116K
- cumulative oil, bbl
- 176K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 35 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Alazan O-4-6998 | Alazan (All Zones) | Exxon Corp. | 34 | 116K | 129K | Jan 1993 – Jun 1998 |
| King Ranch Alazan G-4-145779 | Alazan (South, D-00) | Exxon Corp. | 1 | 0 | 46.5K | Mar 1993 – Jun 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Jun 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 410968-99 | Recompletion | Exxon Corp. | Apr 22, 1993 | Apr 22, 1993 | Mar 15, 1993 | 3,080 |
| 296754-99 | Recompletion | Exxon Corp. | Jan 29, 1986 | Jan 30, 1986 | — | 9,900 |
| 176141-99 | Recompletion | Exxon Corp. | Nov 2, 1982 | Nov 2, 1982 | — | 9,900 |
| 173572-99 | Recompletion | Exxon Corp. | Oct 5, 1982 | Oct 5, 1982 | — | 9,900 |
| 42725-99 | Drill | Exxon Corp. | Feb 20, 1979 | Feb 20, 1979 | Mar 5, 1979 | 9,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-145779 | — | — | — | — |
| — | — O-4-6998 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,023 | 3,030 | Perforated |
| 6,798 | 6,804 | Perforated |
| 7,701 | 7,703 | Perforated |
| 9,010 | 9,013 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,523 | 12.25 | 650 S |
| 9.625 | 1,524 | 12.25 | 650 S |
| 1.25 | 6,964 | — | — |
| 2.875 | 9,482 | 8.5 | 2,355 S |
| 2.875 | 9,483 | 8.5 | 2,355 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 1993 | May 20, 1993 | — |
| 00 | Jul 12, 1993 | — | — |
| 00 | Feb 17, 1984 | Nov 21, 1983 | — |
| 00 | Jan 12, 1984 | Nov 21, 1983 | — |
| 00 | Jan 12, 1984 | Dec 5, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31349 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31349 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331349, documented in the API reference.