WELL · 42-273-31795 · DISTRICT 4
Wenner-State Tract 82 #5
Kleberg County · Directional
Wenner-State Tract 82 #5 (API 42-273-31795) is a permitted well in Kleberg County filed by Wainoco Oil & Gas Company; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1983 and 1993, permitted to 12,300 ft.
Completion filings report 4 formation tops, including Oakville, Catahoula, Anahuac, Frio.
Its 2 leases have reported 123K barrels of oil and 72.5K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Houston, TX · P-5 Y, filed Sep 6, 1996 · 201 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Salt Creek Production, Inc.through Sep 2016 |
| Latest permit | Wainoco Oil & Gas CompanyMar 22, 1993 |
- 12,300
- total depth, ft
- 3
- permits on file
- Mar 22, 1993
- last permit issued
- —
- completed
- 123K
- cumulative oil, bbl
- 72.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wenner - State Tract 82 O-4-12172 | Yeary (7400 Sand) | Tejas Petroleum Resources, LLC | 1 | 123K | 72.5K | Jan 1993 – Jul 2026 |
| — G-4-108988 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wainoco Oil & Gas CompanyMar 1993 → May 1995
- 2Lamay CorporationJun 1995 → Oct 2015
- 3Salt Creek Production, Inc.Jan 2016 → Sep 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 410088-99 | Recompletion | Wainoco Oil & Gas Company | Mar 22, 1993 | Mar 22, 1993 | — | 8,401 |
| 403488-99 | Recompletion | Wainoco Oil & Gas Company | Sep 15, 1992 | Sep 21, 1992 | Sep 15, 1992 | 10,955 |
| 202844-99 | Drill | Texaco Inc. | Jul 22, 1983 | Jul 22, 1983 | Aug 8, 1983 | 12,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-108988 | — | — | — | — |
| — | — O-4-12172 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 26 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,404 | 7,414 | Perforated |
| 11,108 | 11,134 | Perforated |
| 11,145 | 11,166 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,620 | 17.5 | 1,375 S |
| 9.625 | 8,975 | 12.25 | 700 S |
| 5.5 | 11,653 | 6.5 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 18, 1993 | Oct 16, 1992 | Yes |
| 00 | Mar 30, 1993 | — | — |
| 00 | Mar 1, 1984 | Jan 26, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31795 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31795 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331795, documented in the API reference.