WELL · 42-273-32266 · DISTRICT 4
King Ranch Borregos #M 56E
Kleberg County · Wildcat field · Vertical
King Ranch Borregos #M 56E (API 42-273-32266) is a plugged well in Kleberg County, plugged December 3, 1999, last operated by Exxon Corp..
The RRC has issued one drilling permit (amended once), issued March 11, 1998, permitted to 12,960 ft.
Completion filings report 3 formation tops, including 7000 Fs, 5000fs, 4000 Fs.
Operator of record
Houston, TX · P-5 S, filed Mar 15, 1999 · 19,549 permits on file · (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Mar 11, 1998 |
- 12,960
- total depth, ft
- 2
- permits on file
- Mar 11, 1998
- last permit issued
- Dec 9, 1998
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1998 THROUGH Dec 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 9, 1998
- Shut in
- —
- Plugged
- Dec 3, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Borregos G-4-175638 | Wildcat | Exxon Corp. | 1 | 0 | 0 | Dec 1998 – Dec 1999 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 474049-98 | Drill | Exxon Corp. | Jun 16, 1998 | Mar 11, 1998 | Oct 16, 1998 | 12,960 |
| 474049-99 | Drill | Exxon Corp. | Mar 5, 1998 | Mar 11, 1998 | — | 12,960 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-175638 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 109 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 7000 FS | 9,560 | -9,451 |
| 5000FS | 10,680 | -10,571 |
| 4000 FS | 11,412 | -11,303 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,508 | 14.75 | 870 S |
| 7.625 | 8,388 | 9.875 | 490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 29, 2000 | May 13, 1999 | Yes |
| 00 | Feb 10, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-32266 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-32266 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27332266, documented in the API reference.