WELL · 42-273-32377 · DISTRICT 4
Baffin Bay State Tract 83 #1
Kleberg County · Del Grullo (9100 Sand) field · Directional
Baffin Bay State Tract 83 #1 (API 42-273-32377) is a plugged well in Kleberg County, plugged October 20, 2023, last operated by Tejas Petroleum Resources LLC.
The RRC has issued one drilling permit (amended once), issued December 2, 2002, permitted to 11,900 ft.
It was permitted by Manti Operating Company and has since transferred to Tejas Petroleum Resources LLC on the wellbore schedule.
Its lease has reported 33.2K barrels of oil and 13.2K mcf of gas since January 2003, last reporting in July 2026.
Operator of record
Permitted by Manti Operating Company; the EWA schedule now lists a different operator.
Aubrey, TX · P-5 Y, filed May 4, 2026 · (940) 368-7442
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tejas Petroleum Resources LLC |
| Production reports | Salt Creek Production, Inc.through Aug 2016 |
| Latest permit | Manti Operating CompanyDec 2, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,900
- total depth, ft
- 2
- permits on file
- Dec 2, 2002
- last permit issued
- Jan 28, 2003
- completed
- 33.2K
- cumulative oil, bbl
- 13.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 28, 2003
- Shut in
- —
- Plugged
- Oct 20, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baffin Bay State Tract 83 O-4-13150 | Del Grullo (9100 Sand) | Tejas Petroleum Resources, LLC | 1 | 33.2K | 13.2K | Jan 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Manti Operating CompanyJan 2003 → Oct 2005
- 2Lamay CorporationNov 2005 → Dec 2015
- 3Salt Creek Production, Inc.Jan 2016 → Aug 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 525921-98 | Drill | Manti Operating Company | Jan 14, 2003 | Dec 2, 2002 | Dec 8, 2002 | 11,900 |
| 525921-99 | Drill | Manti Operating Company | Nov 27, 2002 | Dec 2, 2002 | — | 11,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-13150 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,960 | 9,977 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,100 | 14.75 | 1,845 S |
| 5.5 | 10,812 | 9.875 | 960 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 28, 2003 | Feb 26, 2003 | Yes |
| 00 | Jun 5, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-32377 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-32377 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27332377, documented in the API reference.