WELL · 42-273-32498 · DISTRICT 4

Jesuit Gas Unit #6

N

Kleberg County · Jesuit (Loyola Beach) field  · Directional

Jesuit Gas Unit #6 (API 42-273-32498) is a well in Kleberg County operated by Manti Operating Company, completed March 25, 2008.

The RRC has issued 2 drilling permits between 2007 and 2008, permitted to 12,800 ft.

Completion filings report 3 formation tops, including Del Grullo, Morgan, 10900 Sand.

No lease production has been reported under this well’s leases.

Operator of record

Manti Operating Company

Covington, LA · P-5 Y, filed Nov 3, 2017 · 218 permits on file · (985) 705-4186

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleManti Operating Company
Production reportsFinaly Resources LLCthrough Dec 2024
Latest permitManti Operating CompanyOct 30, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,800
total depth, ft
2
permits on file
Oct 30, 2008
last permit issued
Mar 25, 2008
completed
0
cumulative oil, bbl
1.28M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 25, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jesuit Gas Unit G-4-246639Jesuit (Rivera)Finaly Resources LLC101.14MSep 2008 – Jul 2026
Jesuit Gas Unit G-4-238435Jesuit (Loyola Beach)Manti Operating Company10137KMar 2008 – May 2009

Gas, mcf lease total

Last 12 months 0 · prior 12 541(-100%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Manti Operating CompanyMar 2008 → Dec 2009
  2. 2Manti Exploration Operating LLCJan 2010 → Sep 2010
  3. 3Finaly Resources LLCDec 2023 → Dec 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
673893-99RecompletionManti Operating CompanyOct 27, 2008Oct 30, 2008Aug 31, 20089,855
651571-99DrillManti Operating CompanyDec 17, 2007Dec 20, 2007Dec 29, 200712,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-238435————
—— G-4-246639————

Formation tops

As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →

FormationMD ftSubsea
Del Grullo11,256-11,241
Morgan11,321-11,306
Del Grullo12,256-12,241
10900 Sand12,820-12,805

Perforations

Perforated and open-hole intervals.

FromToType
9,7489,756Perforated
12,40012,416Perforated
12,85012,880Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,06212.25894 S
5.513,1408.51,630 S
16———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 3, 2009Jun 17, 2008—
00Jun 2, 2009Nov 6, 2008Yes
00Apr 28, 2009——
00Sep 18, 2008Apr 24, 2008Yes
00Sep 6, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112041H-1 InjectionNot activated2,0004,3259,748–9,756

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27332498, documented in the API reference.