WELL · 42-275-30698 · DISTRICT 9

Tynes W. M. #9

Plugged

Knox County · Goree field  · Vertical

Tynes W. M. #9 (API 42-275-30698) is a plugged well in Knox County, plugged June 28, 1989, last operated by Petro-Tex Operating CO..

The RRC has issued one drilling permit, issued January 25, 1979, permitted to 1,800 ft.

It was permitted by Lewis, R. T. and has since transferred to Petro-Tex Operating CO. on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Operator of record

Petro-Tex Operating Co.

Permitted by Lewis, R. T.; the EWA schedule now lists a different operator.

Benbrook, TX · P-5 Y, filed Jul 3, 1996 · 5 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetro-Tex Operating Co.
Production reportsnone
Latest permitLewis, R. T.Jan 25, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,800
total depth, ft
1
permits on file
Jan 25, 1979
last permit issued
Feb 28, 1979
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 28, 1979
Shut in
—
Plugged
Jun 28, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
41480-99DrillLewis, R. T.Jan 25, 1979Jan 25, 1979Jan 27, 19791,800

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Tannehill1,878

Perforations

Perforated and open-hole intervals.

FromToType
1,7401,741Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510112.25100 S
4.51,8747.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 1985Sep 3, 1985Yes
00Sep 18, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27530698, documented in the API reference.