WELL · 42-275-30897 · DISTRICT 9

Cartwright P. V. (West) #73-1

Plugged

Knox County · Goree field  · Vertical

Cartwright P. V. (West) #73-1 (API 42-275-30897) is a plugged well in Knox County, plugged February 18, 2014, last operated by Ames Adrian.

The RRC has issued one drilling permit, issued October 15, 1980, permitted to 1,900 ft.

It was permitted by Cooper, Glenn W. and has since transferred to Ames Adrian on the wellbore schedule.

Completion filings report 3 formation tops, including Coleman Junction, Dolthan Lime, Tannehill.

Its lease has reported 8.44K barrels of oil and 28 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Ames Adrian

Permitted by Cooper, Glenn W.; the EWA schedule now lists a different operator.

Aransas Pass, TX · P-5 Y, filed Mar 6, 2015

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmes Adrian
Production reportsAmes, Adrianthrough Jun 2008
Latest permitCooper, Glenn W.Oct 15, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
Oct 15, 1980
last permit issued
Dec 3, 1980
completed
8.44K
cumulative oil, bbl
28
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 3, 1980
Shut in
—
Plugged
Feb 18, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cartwright, P. V. (West) O-13-20607GoreeAmes, Adrian58.44K28Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cooper, Glenn W. Oil & GasJan 1993 → Jun 1993
  2. 2GBG Operating Corp.Jul 1993 → Apr 1996
  3. 3B. B. & B.May 1996 → Feb 2002
  4. 4Pro-Systems Fab, Inc.Apr 2002 → Mar 2003
  5. 5Ames, AdrianDec 2006 → Jun 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
95639-99DrillCooper, Glenn W.Oct 15, 1980Oct 15, 1980Nov 7, 19801,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-20607————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Coleman Junction1,224
Dolthan Lime1,325
TannehillTANNEHILL SAND 'A'1,620
TannehillTANNEHILL SAND 'B'1,656
TannehillTANNEHILL SAND 'C'1,726

Perforations

Perforated and open-hole intervals.

FromToType
1,6201,672Perforated
1,6571,671Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510312.25100 S
2.3751,650——
4.51,7647.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 22, 1997May 8, 1997—
00Jan 12, 1984Dec 9, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
182K
bbl, all reported
Feb 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081673H-1 InjectionPlugged Apr 22, 20142005001,620–1,672

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 2,400(-100%)

010020020082009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27530897, documented in the API reference.