WELL · 42-275-30960 · DISTRICT 9

Day Essie Mae #2

Plugged

Knox County · Ajax (Tannehill) field  · Vertical

Day Essie Mae #2 (API 42-275-30960) is a plugged well in Knox County, plugged October 11, 2010, last operated by G & F Oil Inc..

The RRC has issued one drilling permit, issued March 13, 1981, permitted to 2,300 ft.

It was permitted by Mayfield Engineering Service and has since transferred to G & F Oil Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Base Coleman Jct, Ajax Tannehill, Tannehill.

Its lease has reported 2.36K barrels of oil and 5 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

G & F Oil Inc.

Permitted by Mayfield Engineering Service; the EWA schedule now lists a different operator.

Aledo, TX · P-5 Y, filed Jul 4, 2026 · 150 permits on file · (817) 939-8851

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleG & F Oil Inc.
Production reportsG & F Oil, Inc.through Sep 2021
Latest permitMayfield Engineering ServiceMar 13, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,300
total depth, ft
1
permits on file
Mar 13, 1981
last permit issued
Dec 2, 1983
completed
2.36K
cumulative oil, bbl
5
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 2, 1983
Shut in
—
Plugged
Oct 11, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Day, Essie Mae O-13-18653Ajax (Tannehill)G & F Oil, Inc.42.36K5Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bitter Creek Petroleum Co.Sep 1994 → Feb 1996
  2. 2Texas Land Inc.Apr 2000 → Jan 2008
  3. 3Tri Energy Resources, Inc.May 2014 → Oct 2015
  4. 4G & F Oil, Inc.Jan 2020 → Sep 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
112291-99DrillMayfield Engineering ServiceMar 13, 1981Mar 13, 1981—2,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18653————

Formation tops

As filed on W-2/G-1. Subsea from 1,497 ft elevation.Download CSV →

FormationMD ftSubsea
Base Coleman JCT1,980-483
Ajax Tannehill2,100-603
TannehillTANNEHILL #7 ZONE2,164-667

Perforations

Perforated and open-hole intervals.

FromToType
2,1012,114Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.25—
2.3752,109——
4.52,1667.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 10, 1985Nov 14, 1984—
00Jan 12, 1984Aug 5, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
38.9K
bbl, all reported
Feb 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000050143H-1 InjectionPlugged Oct 14, 2010002,101–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27530960, documented in the API reference.