WELL · 42-275-31058 · DISTRICT 9

Thompson #7

N

Knox County · Voss (Tannehill) field  · Vertical

Thompson #7 (API 42-275-31058) is a well in Knox County operated by Bitter Creek Petroleum CO., completed June 14, 1988.

The RRC has issued one drilling permit, issued August 25, 1981, permitted to 1,450 ft.

It was permitted by Hatcher, Ray and has since transferred to Bitter Creek Petroleum CO. on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its 2 leases have reported 8.5K barrels of oil and 76 mcf of gas since January 1993, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Bitter Creek Petroleum Co.

Permitted by Hatcher, Ray; the EWA schedule now lists a different operator.

Knox City, TX · P-5 Y, filed Mar 4, 2026 · (940) 203-2398

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBitter Creek Petroleum Co.
Production reportsBitter Creek Petroleum Co.through Apr 2019
Latest permitHatcher, RayAug 25, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,450
total depth, ft
1
permits on file
Aug 25, 1981
last permit issued
Jun 14, 1988
completed
8.5K
cumulative oil, bbl
76
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 14, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson O-13-20402Voss (Tannehill)Bitter Creek Petroleum Co.88.5K76Jan 1993 – Jul 2026
Thompson -A- O-13-34099Voss (Tannehill)RJM Oil Company, LLC300Mar 2022 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oilco ServicesJan 1993 → Dec 1996
  2. 2Mesa Oil ToolsApr 1997 → Nov 1999
  3. 3Bitter Creek Petroleum Co.Jan 2000 → Apr 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
130988-99DrillHatcher, RayAug 25, 1981Aug 25, 1981—1,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-20402————
—— O-13-34099————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Tannehill1,960
TannehillUPPER (TANNEHILL)1,960

Perforations

Perforated and open-hole intervals.

FromToType
1,9551,979Perforated
1,9601,963Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7.6251009.2550 S
4.51,9796.75100 S
4.51,9797.875100 S
21,979——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 2025May 16, 2025—
00May 18, 2022Jun 20, 1988—
00Aug 5, 1988Jun 20, 1988—
00Jan 12, 1984Feb 1, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
681K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066587H-1 InjectionActive3008001,960–1,963

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27531058, documented in the API reference.