WELL · 42-275-31481 · DISTRICT 9

Burnett Estate #19

Plugged

Knox County · Bobby B (Tann) field  · Vertical

Burnett Estate #19 (API 42-275-31481) is a plugged well in Knox County, plugged May 2, 2024, last operated by Texas Jwb LLC.

The RRC has issued one drilling permit, issued August 17, 1983, permitted to 2,600 ft.

It was permitted by Ausanka Oil Operations and has since transferred to Texas Jwb LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Coleman Junction, Doltan Lime (Base), Tannehill.

Its lease has reported 98.6K barrels of oil and 4.22K mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.

Operator of record

Texas JWB LLC

Permitted by Ausanka Oil Operations; the EWA schedule now lists a different operator.

Rowlett, TX · P-5 Y, filed Jul 3, 2024 · (469) 955-2640

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas JWB LLC
Production reportsTexas JWB LLCthrough Dec 2020
Latest permitAusanka Oil OperationsAug 17, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,600
total depth, ft
1
permits on file
Aug 17, 1983
last permit issued
—
completed
98.6K
cumulative oil, bbl
4.22K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 2, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burnett Estate O-13-18959Bobby B (Tann)Texas JWB LLC1898.6K4.22KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ausanka Oil OperationsJan 1993 → Apr 1993
  2. 2Farmer, Lewis & HaydenMay 1993 → Oct 1997
  3. 3Whitfield EnergyNov 1997 → Jan 1999
  4. 4Extex Operating CompanyFeb 1999 → Sep 2003
  5. 5J&R OperatingOct 2003 → Nov 2004
  6. 6J & R Operating, Inc.Dec 2004 → Sep 2006
  7. 7Snakeye ProductionOct 2006 → Apr 2008
  8. 8Bmbd Enterprises, LLCMay 2008 → Jun 2011
  9. 9Vault Operating, LLCJul 2011 → Mar 2013
  10. 10Paradigm Exploration CompanyApr 2013 → Jul 2020
  11. 11Texas JWB LLCNov 2020 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
206176-99DrillAusanka Oil OperationsAug 12, 1983Aug 17, 1983Jan 18, 19842,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18959————

Formation tops

As filed on W-2/G-1. Subsea from 1,449 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION LIME1,490-41
Doltan Lime (Base)2,040-591
TannehillTANNEHILL SAND2,244-795

Perforations

Perforated and open-hole intervals.

FromToType
2,2482,254Perforated
2,2482,258Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513512.25100 S
5.52,4417.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 1993Jul 2, 1993—
00Jul 9, 1993Jun 24, 1993—
00May 20, 1987Apr 13, 1987—
00Feb 28, 1984Feb 8, 1984—
00Feb 23, 1984Feb 8, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

98
bbl, last 12 reported months
445
bbl, all reported
Oct 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060631H-1 InjectionPlugged Jun 6, 20245001,0002,248–2,258

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 98 · prior 12 265(-63%)

010020019911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.