WELL · 42-275-31527 · DISTRICT 9

Johnson #4

Plugged

Knox County · Booe (Tannehill 1990) field  · Vertical

Johnson #4 (API 42-275-31527) is a plugged well in Knox County, plugged September 8, 2004, last operated by Waggoner Ralph E..

The RRC has issued one drilling permit, issued March 2, 1984, permitted to 2,200 ft.

It was permitted by Crocker Oil Company and has since transferred to Waggoner Ralph E. on the wellbore schedule.

Completion filings report 3 formation tops, including Coleman Junction, Dothan Lime, Tannehill.

Its lease has reported 12.7K barrels of oil and 21 mcf of gas since January 1993, last reporting in December 2004. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Waggoner Ralph E.

Permitted by Crocker Oil Company; the EWA schedule now lists a different operator.

Windthorst, TX · P-5 Y, filed Sep 3, 2010 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Ralph E.
Production reportsWaggoner, Ralph E.through Mar 2004
Latest permitCrocker Oil CompanyMar 2, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,200
total depth, ft
1
permits on file
Mar 2, 1984
last permit issued
Jun 19, 1995
completed
12.7K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 19, 1995
Shut in
—
Plugged
Sep 8, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson O-13-18363Booe (Tannehill 1990)Waggoner, Ralph E.312.7K21Jan 1993 – Dec 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Waggoner, Ralph E.Jan 1993 → Mar 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
231233-99DrillCrocker Oil CompanyFeb 24, 1984Mar 2, 1984—2,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18363————

Formation tops

As filed on W-2/G-1. Subsea from 1,518 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,590-72
Dothan Lime1,850-332
TannehillTANNEHILL SAND1,990-472

Perforations

Perforated and open-hole intervals.

FromToType
1,9901,995Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.25120 S
4.52,1177.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 3, 1999Dec 22, 1998—
00Aug 30, 1984Jun 11, 1984—
00Aug 17, 1984Jun 11, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
77.3K
bbl, all reported
Feb 2005
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082748H-1 InjectionPlugged Oct 13, 20042006001,990–1,995

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 17,951(-100%)

05001K1.5K20042005

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27531527, documented in the API reference.