WELL · 42-275-31612 · DISTRICT 13

Counts, Walter David #1

N

Knox County  · Vertical

Counts, Walter David #1 (API 42-275-31612) is a former disposal or injection well in Knox County, last operated by Chap Operating, Inc.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 5,000 ft.

Operator of record

Chap Operating, Inc.

Knox City, TX · P-5 Y, filed Jan 4, 2026 · 1 permits on file · (940) 256-0028

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitChap Operating, Inc.May 13, 1986
5,000
total depth, ft
2
permits on file
May 13, 1986
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
302030-99OtherChap Operating, Inc.May 9, 1986May 13, 1986—3,050
256769-99DrillDelray Oil, Inc.Oct 30, 1984Nov 6, 1984—5,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082632W-14 DisposalCanceled Mar 29, 20232,5001,0002,952–2,988

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27531612, documented in the API reference.