WELL · 42-275-31634 · DISTRICT 9
Hertel #1
Knox County · Jungman (Tannehill) field · Vertical
Hertel #1 (API 42-275-31634) is a well in Knox County operated by Richardson Bud II, completed February 7, 1985.
The RRC has issued 2 drilling permits between 1984 and 1997, permitted to 2,200 ft.
Completion filings report 2 formation tops, including L. Tannehill, Tannehill.
Its 2 leases have reported 84K barrels of oil and 25 mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
Graham, TX · P-5 Y, filed Mar 6, 2009 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Richardson Bud II |
| Production reports | Petexthrough Apr 2026 |
| Latest permit | Richardson, Bud IIJul 18, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,200
- total depth, ft
- 2
- permits on file
- Jul 18, 1997
- last permit issued
- Feb 7, 1985
- completed
- 84K
- cumulative oil, bbl
- 25
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 7, 1985
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hertel O-13-29361 | Hertel (Tannehill) | Petex | 6 | 79.5K | 0 | Jul 1997 – Jul 2026 |
| Hertel O-13-25077 | Jungman (Tannehill) | Richardson, Bud II | 1 | 4.49K | 25 | Jan 1993 – Mar 2008 |
Oil, barrels lease total
Last 12 months 1,821 · prior 12 1,378(+32%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Atnipp, H. L.Jan 1993 → Feb 1997
- 2Richardson, Bud IIMar 1997 → Dec 1997
- 3Savannah Ross and Company, LLCJan 1998 → Dec 1998
- 4Bettis, Boyle & StovallJan 1999 → Jun 2022
- 5PetexAug 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 464393-99 | Field transfer | Richardson, Bud II | Jun 30, 1997 | Jul 18, 1997 | Dec 24, 1984 | 2,146 |
| 260826-99 | Drill | Bristol Oil & Gas Corporation | Oct 8, 1985 | Dec 10, 1984 | Dec 24, 1984 | 2,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-25077 | — | — | — | — |
| — | — O-13-29361 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,448 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| L. Tannehill | 2,140 | -692 |
| Tannehill | 2,140 | -692 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,140 | 2,143 | Perforated |
| — | 2,143 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 101 | 12.25 | 90 S |
| 4.5 | 2,146 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1997 | Jul 2, 1997 | — |
| 00 | Aug 13, 1997 | Feb 15, 1985 | Yes |
| 00 | Mar 7, 1985 | Feb 15, 1985 | Yes |
| 00 | Mar 1, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-275-31634 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-275-31634 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27531634, documented in the API reference.