WELL · 42-275-31736 · DISTRICT 9

Livingston Ranch #310

Plugged

Knox County · Bobby B (Tann) field  · Vertical

Livingston Ranch #310 (API 42-275-31736) is a plugged well in Knox County, plugged July 27, 2005, last operated by Royal Oryx OG LLC.

The RRC has issued one drilling permit, issued December 30, 1985, permitted to 2,700 ft.

It was permitted by Megargel Drlg. CO. and has since transferred to Royal Oryx OG LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Tannehil, Tannehill.

Its lease has reported 59K barrels of oil and 172 mcf of gas since January 1993, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Royal Oryx OG LLC

Permitted by Megargel Drlg. Co.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Jan 4, 2026 · (682) 232-5661

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoyal Oryx OG LLC
Production reportsRoyal Oryx OG LLCthrough Apr 2026
Latest permitMegargel Drlg. Co.Dec 30, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,700
total depth, ft
1
permits on file
Dec 30, 1985
last permit issued
—
completed
59K
cumulative oil, bbl
172
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 27, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Livingston Ranch O-13-25649Bobby B (Tann)Royal Oryx OG LLC1359K172Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 27 · prior 12 20(+35%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Livingston, F. L.Jan 1993 → Aug 2014
  2. 2Bitter Creek Petroleum Co.Sep 2014 → Mar 2016
  3. 3Sheneeda Energy, LLCJun 2016 → Jun 2025
  4. 4Martis Valley Energy, LLCJul 2025 → Dec 2025
  5. 5Royal Oryx OG LLCJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
293747-99DrillMegargel Drlg. Co.Dec 30, 1985Dec 30, 1985Dec 30, 19852,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25649————

Formation tops

As filed on W-2/G-1. Subsea from 1,413 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehil2,316-903
Tannehill2,316-903

Perforations

Perforated and open-hole intervals.

FromToType
2,3162,317Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513212.25100 S
4.52,4087.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 12, 1996Jul 24, 1996—
00Aug 8, 1996Jul 24, 1996—
00Dec 15, 1988Nov 18, 1988—
00Mar 11, 1986Feb 25, 1986Yes
00Mar 5, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

28.4K
bbl, last 12 reported months
1.85M
bbl, all reported
Feb 2005
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066398H-1 InjectionPlugged Aug 8, 20051,0008002,316–2,320

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 28,400 · prior 12 45,800(-38%)

02K4K20042005

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27531736, documented in the API reference.