WELL · 42-275-31850 · DISTRICT 9
Hacker #1
Knox County · Bobby B (Tann) field · Vertical
Hacker #1 (API 42-275-31850) is a plugged well in Knox County, plugged May 10, 1996, last operated by Farmer Lewis & Hayden.
The RRC has issued one drilling permit, issued October 13, 1987, permitted to 2,600 ft.
It was permitted by Ausanka Oil Operations and has since transferred to Farmer Lewis & Hayden on the wellbore schedule.
Completion filings report 2 formation tops, including Dothanlime, Tann Sand.
Its lease has reported 513 barrels of oil and 17 mcf of gas since January 1993, last reporting in June 1996.
Operator of record
Permitted by Ausanka Oil Operations; the EWA schedule now lists a different operator.
Olney, TX · P-5 Y, filed Jan 9, 2009 · 266 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Farmer Lewis & Hayden |
| Production reports | Farmer, Lewis & Haydenthrough Aug 1995 |
| Latest permit | Ausanka Oil OperationsOct 13, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,600
- total depth, ft
- 1
- permits on file
- Oct 13, 1987
- last permit issued
- Nov 6, 1987
- completed
- 513
- cumulative oil, bbl
- 17
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 6, 1987
- Shut in
- —
- Plugged
- May 10, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hacker O-13-26879 | Bobby B (Tann) | Farmer, Lewis & Hayden | 1 | 513 | 17 | Jan 1993 – Jun 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ausanka Oil OperationsJan 1993 → Jan 1993
- 2Farmer, Lewis & HaydenJun 1993 → Aug 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 337252-99 | Drill | Ausanka Oil Operations | Oct 12, 1987 | Oct 13, 1987 | — | 2,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26879 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,468 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dothanlime | 1,950 | -482 |
| Tann Sand | 2,270 | -802 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,276 | 2,286 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 142 | 12.25 | 110 S |
| 4.5 | 2,374 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 7, 1988 | Dec 9, 1987 | Yes |
| 00 | Dec 15, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-275-31850 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-275-31850 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27531850, documented in the API reference.