WELL · 42-275-32203 · DISTRICT 9

Zeissel #3

Y

Knox County · Prayer of Jabez (Tannehill) field · Injection  · Vertical

Zeissel #3 (API 42-275-32203) is a well in Knox County operated by Roil Operating LLC, completed January 14, 2010 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 30, 2006, permitted to 3,000 ft.

It was permitted by Novo Exploration Corporation and has since transferred to Roil Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Base Dothan Lime, Tannehill.

Its lease has reported 22.1K barrels of oil since May 2005, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 21K barrels injected in the 12 months reported through February 2026.

Operator of record

Roil Operating LLC

Permitted by Novo Exploration Corporation; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed May 4, 2026 · (940) 456-5133

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoil Operating LLC
Production reportsRyan, Joseph G.through Apr 2026
Latest permitNovo Exploration CorporationOct 30, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Oct 30, 2006
last permit issued
Jan 14, 2010
completed
22.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 14, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Zeissel O-13-30452Prayer of Jabez (Tannehill)Roil Operating LLC222.1K0May 2005 – Jul 2026

Oil, barrels lease total

Last 12 months 265 · prior 12 386(-31%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Novo Exploration CorporationMay 2005 → Nov 2014
  2. 2Borderline Operating Corp.Dec 2014 → Aug 2016
  3. 3Ryan, Joseph G.Sep 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627962-99DrillNovo Exploration CorporationOct 23, 2006Oct 30, 2006Dec 12, 20063,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30452————

Formation tops

As filed on W-2/G-1. Subsea from 1,540 ft elevation.Download CSV →

FormationMD ftSubsea
Base Dothan Lime2,056-516
Tannehill2,156-616
TannehillTANNEHILL SAND2,156-616

Perforations

Perforated and open-hole intervals.

FromToType
2,1562,168Perforated
2,1582,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62511012100 S
4.52,2407.875160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 2012Oct 31, 2011—
00Jan 15, 2008Oct 12, 2007Yes
00Jan 4, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

21K
bbl, last 12 reported months
275K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000101111H-1 InjectionActive6001,0502,156–2,168

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 21,000 · prior 12 21,100(0%)

01K2K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27532203, documented in the API reference.