WELL · 42-275-32205 · DISTRICT 9

Spike Box Ranch #1

Plugged

Knox County · Hailey (Tannehill) field  · Vertical

Spike Box Ranch #1 (API 42-275-32205) is a plugged well in Knox County, plugged July 17, 2015, last operated by D.J.F. Services Inc..

The RRC has issued one drilling permit (amended once), issued May 16, 2007, permitted to 2,800 ft.

It was permitted by China Star Oil CO., LLC and has since transferred to D.J.F. Services Inc. on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its lease has reported 4.03K barrels of oil since July 2007, last reporting in November 2015.

Operator of record

D.J.F. Services Inc.

Permitted by China Star Oil Co., LLC; the EWA schedule now lists a different operator.

Holdenville, OK · P-5 Y, filed Mar 4, 2026 · 27 permits on file · (405) 380-7273

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleD.J.F. Services Inc.
Production reportsChina Star Oil Co., LLCthrough Feb 2010
Latest permitChina Star Oil Co., LLCMay 16, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,800
total depth, ft
2
permits on file
May 16, 2007
last permit issued
Jul 23, 2007
completed
4.03K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Nov 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 23, 2007
Shut in
—
Plugged
Jul 17, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Spike Box Ranch O-13-30845Hailey (Tannehill)D.J.F. Services, Inc.14.03K0Jul 2007 – Nov 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1China Star Oil Co., LLCJul 2007 → Feb 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
638557-98DrillChina Star Oil Co., LLCAug 16, 2007May 16, 2007Jun 19, 20072,800
638557-99DrillChina Star Oil Co., LLCMay 8, 2007May 16, 2007—2,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30845————

Formation tops

As filed on W-2/G-1. Subsea from 1,466 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill2,640-1,174

Perforations

Perforated and open-hole intervals.

FromToType
2,6402,646Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.25110 S
5.52,5917.875375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 23, 2007Aug 22, 2007Yes
00Oct 2, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27532205, documented in the API reference.