WELL · 42-279-30271 · DISTRICT 8
Barrett H. G. #1
Lamb County · Anton-Irish field · Producing · Vertical
Barrett H. G. #1 (API 42-279-30271) is a well in Lamb County operated by Acoma Operating LLC, completed February 29, 1984 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 30, 1984, permitted to 6,000 ft.
It was permitted by Zoag Operating Company and has since transferred to Acoma Operating LLC on the wellbore schedule.
Completion filings report one formation top, including Clear Fork.
Its lease has reported 29.7K barrels of oil and 34 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Zoag Operating Company; the EWA schedule now lists a different operator.
Lubbock, TX · P-5 Y, filed Jun 4, 2026 · 9 permits on file · (214) 709-4399
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Acoma Operating LLC |
| Production reports | Acoma Operating, LLCthrough Mar 2026 |
| Latest permit | Zoag Operating CompanyJan 30, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Jan 30, 1984
- last permit issued
- Feb 29, 1984
- completed
- 29.7K
- cumulative oil, bbl
- 34
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 29, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barrett, H. G. O-11-64745 | Anton-Irish | Acoma Operating, LLC | 1 | 29.7K | 34 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 153 · prior 12 456(-66%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Zebra Oil and GasJan 1993 → Jul 1998
- 2JJ Operations, Inc.Apr 2006 → Jan 2020
- 3Cook Operating, LLCOct 2020 → Jun 2023
- 4Acoma Operating, LLCOct 2023 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 229333-99 | Drill | Zoag Operating Company | Jan 20, 1984 | Jan 30, 1984 | Jan 25, 1984 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-64745 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,442 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkCLEARFORK | 5,595 | -2,153 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,595 | 5,845 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,622 | 12.25 | 550 S |
| 5.5 | 5,595 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 1984 | Mar 5, 1984 | — |
| 00 | Apr 21, 1984 | Mar 5, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-279-30271 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-279-30271 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27930271, documented in the API reference.