WELL · 42-283-20025 · DISTRICT 1
So. Texas Syndicate #39 #4
LA Salle County · Vertical
SO. Texas Syndicate #39 #4 (API 42-283-20025) is a permitted well in La Salle County filed by Pyle Petroleum, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1992 and 2000, permitted to 5,815 ft.
Its 2 leases have reported 27.7K barrels of oil and 48.9K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Tyler, TX · P-5 Y, filed Jun 4, 2025 · 7 permits on file · (817) 690-3529
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Pyle Petroleum, Inc.through Nov 2019 |
| Latest permit | Pyle Petroleum, Inc.Aug 14, 2000 |
- 5,815
- total depth, ft
- 3
- permits on file
- Aug 14, 2000
- last permit issued
- —
- completed
- 27.7K
- cumulative oil, bbl
- 48.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| So. Tex. Syndicate Lease #39 O-1-3947 | Washburn Ranch,w.(wilcx 5100,W.) | Black Gold Operating Co, LLC | 7 | 27.7K | 25.6K | Jan 1993 – Jul 2026 |
| So. Texas Syndicate #39 G-1-178917 | Washburn Ranch, West (4800) | Pyle Petroleum, Inc. | 1 | 0 | 23.3K | Jul 2000 – Mar 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1TNT Petroleum Company, Inc.Jul 1993 → Dec 1995
- 2Pyle Petroleum, Inc.Mar 1996 → Nov 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 497922-99 | Recompletion | Pyle Petroleum, Inc. | Aug 1, 2000 | Aug 14, 2000 | Jul 6, 2000 | 5,815 |
| 425957-99 | Recompletion | TNT Petroleum Company, Inc. | Jul 18, 1994 | Jul 20, 1994 | — | 5,815 |
| 398712-99 | Recompletion | TNT Petroleum Company, Inc. | Apr 24, 1992 | May 12, 1992 | — | 5,815 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-178917 | — | — | — | — |
| — | — O-1-3947 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,750 | 4,755 | Perforated |
| 4,756 | 4,761 | Perforated |
| — | 5,088 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 323 | 12.25 | 100 S |
| 4.5 | 5,648 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 6, 2000 | Jul 31, 2000 | Yes |
| 00 | Oct 12, 2000 | — | — |
| 00 | Sep 25, 1985 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-20025 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-20025 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.