WELL · 42-283-31407 · DISTRICT 1

Pena #1SW

N

LA Salle County · Pearsall (Austin Chalk) field  · Horizontal

Pena #1SW (API 42-283-31407) is a horizontal well in La Salle County operated by Sendero Services Inc, completed May 10, 2011.

The RRC has issued 3 drilling permits between 1991 and 2012, permitted to 7,885 ft.

Completion filings report 6 formation tops, including Carrizo, Base Uqw, Wilcox, Olmos.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 2.28M barrels injected in the 12 months reported through January 2026.

Operator of record

Sendero Services Inc

Hondo, TX · P-5 Y, filed Jan 6, 2017 · 2 permits on file · (281) 723-5628

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSendero Services Inc
Production reportsnone
Latest permitSendero Services, IncMay 8, 2012
7,885
total depth, ft
3
permits on file
May 8, 2012
last permit issued
May 10, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 10, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pena O-1-16322Los Angeles (4800)Evx Operating LLC100Jul 2012 – Jul 2026
Pena O-1-15492Pearsall (Austin Chalk)Sendero Services, Inc100May 2011 – Feb 2013
Pena O-1-13022Pearsall (Austin Chalk)Williams, Clayton Energy, Inc.100Jan 1993 – May 1996

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
739089-99RecompletionSendero Services, IncApr 25, 2012May 8, 2012Jun 27, 20124,250
714045-99ReenterWen-BEApr 11, 2011Apr 15, 2011Apr 21, 20117,885
383225-99DrillWilliams, Clayton W., Jr., Inc.Jan 9, 1991Jan 10, 1991Jan 17, 19917,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13022————
—— O-1-15492————
—— O-1-16322————

Formation tops

As filed on W-2/G-1. Subsea from 491 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo1,950-1,459
Base Uqw2,500-2,009
Wilcox3,600-3,109
Olmos4,700-4,209
Anacacho5,600-5,109
Austin Chalk7,500-7,009
Anacacho7,823-7,332

Perforations

Perforated and open-hole intervals.

FromToType
3,6003,800Perforated
7,50012,004Open hole
7,61012,000Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7579114.75550 S
7.6252,6389.875460 S
9.8757,6109.875200 S
7.6257,6109.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2013Aug 1, 2012—
00Dec 21, 2011May 27, 2011—
00May 14, 1991Mar 25, 1991Yes
00May 6, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.28M
bbl, last 12 reported months
28M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102469H-1 InjectionActive25,0001,8003,600–3,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,277,666 · prior 12 1,458,037(+56%)

0100K200K300K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28331407, documented in the API reference.