WELL · 42-283-31457 · DISTRICT 1

Wilson Ranch #1

Plugged

LA Salle County · Pearsall (Austin Chalk) field  · Horizontal

Wilson Ranch #1 (API 42-283-31457) is a plugged horizontal well in La Salle County, plugged February 12, 2015, last operated by Stonegate Production Company LLC.

The RRC has issued one drilling permit, issued August 28, 1991, permitted to 8,000 ft.

It was permitted by Tide West Oil Company and has since transferred to Stonegate Production Company LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Anacacho, Austin Chalk.

Its lease has reported 91.2K barrels of oil and 1.11K mcf of gas since January 1993, last reporting in October 2017. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Stonegate Production Company LLC

Permitted by Tide West Oil Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 4, 2018 · 250 permits on file · (832) 920-4954

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStonegate Production Company LLC
Production reportsStonegate Production Company,llcthrough Sep 2015
Latest permitTide West Oil CompanyAug 28, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Aug 28, 1991
last permit issued
Oct 2, 1991
completed
91.2K
cumulative oil, bbl
1.11K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 2, 1991
Shut in
—
Plugged
Feb 12, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson Ranch O-1-13314Pearsall (Austin Chalk)Stonegate Production Company,llc691.2K1.11KJan 1993 – Oct 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tide West Oil CompanyJan 1993 → Feb 1994
  2. 2Horizon Natural Resources, Inc.Mar 1994 → Nov 1998
  3. 3Vermillion Production, Inc.Mar 1999 → Dec 1999
  4. 4Dos Oil & Gas, Inc.Jan 2000 → Jan 2002
  5. 5Caprock Exploration, Inc.Feb 2002 → Jul 2006
  6. 6Fortune Operating CompanyAug 2006 → Aug 2007
  7. 7Acock Operating LimitedSep 2007 → Jan 2008
  8. 8Estrella Exploration Co., LLCApr 2008 → Sep 2008
  9. 9Stonegate Production Company,llcFeb 2009 → Sep 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391359-99DrillTide West Oil CompanyAug 28, 1991Aug 28, 1991Aug 29, 19918,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13314————

Formation tops

As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho7,222-7,199
Austin Chalk7,503-7,480

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.37588314.75555 S
7.8757,3039.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 1991Dec 5, 1991Yes
00Dec 11, 1991Oct 16, 1991Yes
00Dec 10, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28331457, documented in the API reference.