WELL · 42-283-31679 · DISTRICT 1
Straw #1
LA Salle County · Nunley Ranch (5890) field · Vertical
Straw #1 (API 42-283-31679) is a plugged well in La Salle County, plugged June 7, 2012, last operated by Modern Exploration Inc..
The RRC has issued one drilling permit, issued February 1, 2000, permitted to 6,500 ft.
Completion filings report one formation top, including Nunley Ranch (5890).
Operator of record
Sherman, TX · P-5 Y, filed May 4, 2026 · 195 permits on file · (903) 893-1129
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Modern Exploration Inc. |
| Production reports | Modern Exploration, Inc.through Feb 2002 |
| Latest permit | Modern Exploration, Inc.Feb 1, 2000 |
- 6,500
- total depth, ft
- 1
- permits on file
- Feb 1, 2000
- last permit issued
- Mar 24, 2000
- completed
- 0
- cumulative oil, bbl
- 83.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2000 THROUGH Jun 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 24, 2000
- Shut in
- —
- Plugged
- Jun 7, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Straw G-1-177507 | Nunley Ranch (5890) | Modern Exploration, Inc. | 1 | 0 | 83.1K | Apr 2000 – Jun 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Modern Exploration, Inc.Jun 2000 → Feb 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 491606-99 | Drill | Modern Exploration, Inc. | Feb 1, 2000 | Feb 1, 2000 | Feb 17, 2000 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-177507 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 340 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nunley Ranch (5890) | 5,832 | -5,492 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,832 | 5,844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,322 | 12.25 | 330 S |
| 4.5 | 6,092 | 7.875 | 280 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 2, 2000 | May 3, 2000 | Yes |
| 00 | Jul 11, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-31679 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-31679 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28331679, documented in the API reference.