WELL · 42-283-32034 · DISTRICT 1
Herradura Ranch #9
LA Salle County · Herradura (1ST Yegua) field · Temp Abandoned · Vertical
Herradura Ranch #9 (API 42-283-32034) is a well in La Salle County operated by Ggg Oil Company Ltd., completed February 15, 2009 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued May 9, 2007, permitted to 950 ft.
Completion filings report 2 formation tops, including Mirando Sand, Yegua.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Cotulla, TX · P-5 Y, filed Oct 4, 2025 · 4 permits on file · (210) 844-3434
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | GGG Oil Company Ltd. |
| Production reports | GGG Oil Company, Ltd.through Mar 2010 |
| Latest permit | GGG Oil Company, Ltd.May 9, 2007 |
- 950
- total depth, ft
- 1
- permits on file
- May 9, 2007
- last permit issued
- Feb 15, 2009
- completed
- 0
- cumulative oil, bbl
- 38.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 15, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Herradura Ranch G-1-235213 | Herradura (1ST Yegua) | GGG Oil Company, Ltd. | 1 | 0 | 38.8K | Dec 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1GGG Oil Company, Ltd.Mar 2008 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 638195-99 | Drill | GGG Oil Company, Ltd. | May 2, 2007 | May 9, 2007 | Oct 30, 2007 | 950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-235213 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 268 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 852 | 862 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 926 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 24, 2020 | Feb 27, 2020 | — |
| 00 | Dec 17, 2019 | Jul 18, 2019 | — |
| 00 | Jun 30, 2008 | Mar 12, 2008 | Yes |
| 00 | May 23, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-32034 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-32034 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 52.5K
- bbl, all reported
- Oct 2023
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000115429 | H-1 Injection | Active | 500 | 426 | 852–926 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 4,637(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28332034, documented in the API reference.