WELL · 42-283-32625 · DISTRICT 1

Fiedler Brothers SWD #2

WaterN

LA Salle County  · Vertical

Fiedler Brothers Swd #2 (API 42-283-32625) is a former disposal or injection well in La Salle County, last operated by Energy Equity Company; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued May 11, 2011, permitted to 5,800 ft.

Operator of record

Energy Equity Company

Columbus, MT · P-5 Y, filed May 6, 2016 · 9 permits on file · (800) 244-7593

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitEnergy Equity CompanyMay 11, 2011
5,800
total depth, ft
1
permits on file
May 11, 2011
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
715967-99DrillEnergy Equity CompanyMay 9, 2011May 11, 2011—5,800

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105556W-14 DisposalCanceled Mar 13, 201720,0002,2004,850–5,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28332625, documented in the API reference.