WELL · 42-283-33441 · DISTRICT 1

Cotulla SWD #1

WaterY

LA Salle County · Eagleville (Eagle Ford-1) field · Injection  · Vertical

Cotulla Swd #1 (API 42-283-33441) is a well in La Salle County operated by Ngl Watersolutions Eagleford LLC, completed November 10, 2012 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 13, 2012, permitted to 12,100 ft.

It was permitted by T-5 Construction, Inc. and has since transferred to Ngl Watersolutions Eagleford LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Austin Chalk, Eagle Ford, Buda, Georgetown.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 2.13M barrels injected in the 12 months reported through March 2026.

Operator of record

NGL Watersolutions Eagleford LLC

Permitted by T-5 Construction, Inc.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (303) 597-5652

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNGL Watersolutions Eagleford LLC
Production reportsnone
Latest permitT-5 Construction, Inc.Aug 13, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,100
total depth, ft
1
permits on file
Aug 13, 2012
last permit issued
Nov 10, 2012
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 10, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cotulla SWD O-1-16676Eagleville (Eagle Ford-1)NGL Watersolutions Eagleford,llc100Nov 2012 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745863-99DrillT-5 Construction, Inc.Aug 4, 2012Aug 13, 2012Oct 2, 201212,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-16676————

Formation tops

As filed on W-2/G-1. Subsea from 467 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,950-6,483
Eagle Ford7,770-7,303
Buda7,908-7,441
Georgetown8,060-7,593
Edwards8,180-7,713

Perforations

Perforated and open-hole intervals.

FromToType
8,2409,000Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,64514.751,635 S
7.6258,2409.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 2013May 2, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.13M
bbl, last 12 reported months
38.8M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105100W-14 DisposalActive30,0004,0508,100–12,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,128,089 · prior 12 1,968,942(+8%)

0100K200K300K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28333441, documented in the API reference.