WELL · 42-283-33553 · DISTRICT 1
Storey 267 #4H
LA Salle County · Horizontal
Storey 267 #4H (API 42-283-33553) is a permitted horizontal well in La Salle County filed by Bhp Billiton Pet(Txla OP) CO; no completion report is on file yet.
The RRC has issued 3 drilling permits between 2012 and 2014, permitted to 14,000 ft.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
Operator of record
Denver, CO · P-5 Y, filed Mar 5, 2021 · 1,287 permits on file · (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Lewis Petro Properties, Inc.through Apr 2026 |
| Latest permit | BHP Billiton Pet(txla OP) CoAug 7, 2014 |
- 14,000
- total depth, ft
- 3
- permits on file
- Aug 7, 2014
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.31M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Storey 267 G-1-273546 | Hawkville (Eagleford Shale) | Lewis Petro Properties, Inc. | 1 | 0 | 1.31M | Mar 2013 – Jul 2026 |
| Storey 267 G-1-270982 | Eagleville (Eagle Ford-1) | Petrohawk Operating Company | 1 | 0 | 0 | Feb 2013 – Mar 2013 |
Gas, mcf lease total
Last 12 months 1,078 · prior 12 13,058(-92%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BHP Billiton Pet(txla OP) CoMar 2013 → Jul 2019
- 2BPX Operating CompanyAug 2019 → Apr 2023
- 3Lewis Petro Properties, Inc.May 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 790291-99 | Recompletion | BHP Billiton Pet(txla OP) Co | Jun 25, 2014 | Aug 7, 2014 | Feb 19, 2013 | 14,000 |
| 780830-99 | Field transfer | BHP Billiton Pet(txla OP) Co | Feb 27, 2014 | Apr 7, 2014 | — | 14,000 |
| 749085-99 | Drill | Petrohawk Operating Company | Oct 1, 2012 | Oct 8, 2012 | Jan 8, 2013 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-270982 | — | — | — | — |
| — | — G-1-273546 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 428 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 9,963 | -9,535 |
| Austin Chalk | 10,635 | -10,207 |
| Eagle FordEAGLEFORD SHALE | 10,737 | -10,309 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,087 | 15,742 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,020 | 12.25 | 1,170 S |
| 5.5 | 8,494 | 8.75 | 880 S |
| 4.5 | 15,874 | 6.75 | 880 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 18, 2014 | Apr 23, 2014 | Yes |
| 00 | Jan 10, 2014 | Apr 4, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-33553 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-33553 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28333553, documented in the API reference.