WELL · 42-283-33683 · DISTRICT 1

JLH Lic E Unit #C 6H

Y

LA Salle County · Eagleville (Eagle Ford-1) field · Shut IN  · Horizontal

Jlh Lic E Unit #C 6H (API 42-283-33683) is a horizontal well in La Salle County operated by Javelin Energy Partners Mgmt LLC, completed April 11, 2014 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 19, 2012, permitted to 8,371 ft.

It was permitted by Hess Corporation and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Target Top, Eagle Ford.

Its lease has reported 169K barrels of oil and 325K mcf of gas since April 2013, last reporting in July 2026.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Hess Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 4, 2026 · 233 permits on file · (888) 973-7780

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsRidgemar Energy Operating, LLCthrough Nov 2024
Latest permitHess CorporationDec 19, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,371
total depth, ft
2
permits on file
Dec 19, 2012
last permit issued
Apr 11, 2014
completed
169K
cumulative oil, bbl
325K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 11, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
JLH Lic E Unit O-1-16975Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC1169K325KApr 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 559(-100%)

050100150202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 660(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanchez Oil & Gas CorporationJun 2013 → Apr 2014
  2. 2SN Operating, LLCMay 2014 → Nov 2016
  3. 3Carrizo (Eagle Ford) LLCDec 2016 → Jan 2020
  4. 4Callon (Eagle Ford) LLCFeb 2020 → Jun 2023
  5. 5Ridgemar Energy Operating, LLCJul 2023 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
753301-98DrillHess CorporationFeb 21, 2013Dec 19, 2012Mar 17, 20138,371
753301-99DrillHess CorporationDec 17, 2012Dec 19, 2012Mar 17, 20138,371

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-16975————

Formation tops

As filed on W-2/G-1. Subsea from 446 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,252-6,806
Austin Chalk7,418-6,972
Austin ChalkAUSTIN SHALE7,531-7,085
Austin ChalkLOWER AUSTIN CHALK7,704-7,258
Target Top7,719-7,273
Eagle FordUPPER EAGLE FORD8,112-7,666
Eagle FordLOWER EAGLE FORD8,140-7,694

Perforations

Perforated and open-hole intervals.

FromToType
8,59313,326Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,98912.251,420 S
5.513,5068.751,690 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 27, 2015Nov 19, 2014—
00Sep 9, 2013Jul 9, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28333683, documented in the API reference.