WELL · 42-283-35220 · DISTRICT 1

Encinal SWD #2

WaterY

LA Salle County · Hawkville (Eagleford Shale) field · Injection  · Vertical

Encinal Swd #2 (API 42-283-35220) is a well in La Salle County operated by Ngl Watersolutions Eagleford LLC, completed February 24, 2024 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 5, 2014, permitted to 5,000 ft.

It was permitted by High Roller Wells, L.L.C. and has since transferred to Ngl Watersolutions Eagleford LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Yegua, Sparta, Queen City, Wilcox.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 4.28M barrels injected in the 12 months reported through January 2026.

Operator of record

NGL Watersolutions Eagleford LLC

Permitted by High Roller Wells, L.L.C.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (303) 597-5652

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNGL Watersolutions Eagleford LLC
Production reportsnone
Latest permitHigh Roller Wells, L.L.C.Nov 5, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Nov 5, 2014
last permit issued
Feb 24, 2024
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 24, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Encinal SWD G-1-279157Hawkville (Eagleford Shale)NGL Watersolutions Eagleford,llc100Dec 2015 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
799724-99DrillHigh Roller Wells, L.L.C.Nov 5, 2014Nov 5, 2014Nov 25, 20155,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-279157————

Formation tops

As filed on W-2/G-1. Subsea from 536 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua963-427
Sparta2,370-1,834
Queen City2,821-2,285
WilcoxWILCOX - DISPOSAL4,620-4,084
Austin Chalk——
BudaBUDA - H2S——
Eagle FordEAGLE FORD - H2S——
EdwardsEDWARDS - H2S——
Escondido——
OlmosOLMOS - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
4,6584,866Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37525717.5335 S
9.6253,62612.251,395 S
75,0008.7565 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 4, 2024Mar 6, 2024—
00Feb 18, 2016Feb 17, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.28M
bbl, last 12 reported months
23.2M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112687W-14 DisposalActive25,0002,3004,650–4,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,276,042 · prior 12 3,319,295(+29%)

0200K400K600K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.