WELL · 42-283-35480 · DISTRICT 1

Cotulla East SWD #1

WaterPlugged

LA Salle County · Eagleville (Eagle Ford-1) field  · Directional

Cotulla East Swd #1 (API 42-283-35480) is a plugged well in La Salle County, plugged January 12, 2023, last operated by Ngl Watersolutions Eagleford LLC.

The RRC has issued one drilling permit (amended once), issued May 8, 2015, permitted to 10,700 ft.

It was permitted by High Roller Wells, L.L.C. and has since transferred to Ngl Watersolutions Eagleford LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Wilcox, Escondido, Olmos, Austin Chalk.

Operator of record

NGL Watersolutions Eagleford LLC

Permitted by High Roller Wells, L.L.C.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (303) 597-5652

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNGL Watersolutions Eagleford LLC
Production reportsnone
Latest permitHigh Roller Wells, L.L.C.May 8, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,700
total depth, ft
2
permits on file
May 8, 2015
last permit issued
May 4, 2016
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2015 THROUGH Mar 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 4, 2016
Shut in
—
Plugged
Jan 12, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cotulla East SWD O-1-18597Eagleville (Eagle Ford-1)NGL Watersolutions Eagleford,llc100Dec 2015 – Mar 2023

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
806324-98DrillHigh Roller Wells, L.L.C.Oct 5, 2015May 8, 2015Oct 24, 201510,700
806324-99DrillHigh Roller Wells, L.L.C.May 7, 2015May 8, 2015Oct 23, 201510,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-18597————

Formation tops

As filed on W-2/G-1. Subsea from 324 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX - DISPOSAL1,555-1,231
Escondido4,970-4,646
OlmosOLMOS - DISPOSAL6,250-5,926
Austin Chalk8,245-7,921
Eagle FordEAGLE FORD - H2S8,501-8,177
BudaBUDA - H2S8,670-8,346
EdwardsEDWARDS - H2S8,920-8,596
Queen City——
Sparta——
Yegua——

Perforations

Perforated and open-hole intervals.

FromToType
9,20510,700Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37520017.5265 S
9.6254,20012.251,120 S
79,2058.751,330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 1, 2016May 31, 2016—
00Jan 4, 2016Jan 2, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
19.2M
bbl, all reported
Mar 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112956W-14 DisposalPlugged Feb 13, 202325,0004,4508,950–10,700

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 2,385,337(-100%)

0200K400K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28335480, documented in the API reference.