WELL · 42-283-37389 · DISTRICT 1
Altito a 25A Allocation A #260H
LA Salle County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Altito A 25a Allocation A #260H (API 42-283-37389) is a horizontal well in La Salle County operated by Verdun Oil EF II LLC, completed April 13, 2023 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued January 5, 2023, permitted to 9,500 ft.
It was permitted by EP Energy E&P Company, LLC and has since transferred to Verdun Oil EF II LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Wilcox, Austin Chalk, Eagle Ford, Buda.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by EP Energy E&P Company, LLC; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 4, 2025 · 48 permits on file · (800) 770-1082
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Verdun Oil EF II LLC |
| Production reports | Verdun Oil EF II LLCthrough Apr 2026 |
| Latest permit | EP Energy E&P Company, LLCJan 5, 2023 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 2
- permits on file
- Jan 5, 2023
- last permit issued
- Apr 13, 2023
- completed
- 0
- cumulative oil, bbl
- 440K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2023 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 13, 2023
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
28.424536, -99.148414
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in LA Salle County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Altito a 25A Allocation A G-1-298657 | Eagleville (Eagle Ford-1) | Verdun Oil EF II LLC | 1 | 0 | 440K | Apr 2023 – Jul 2026 |
Gas, mcf lease total
Last 12 months 100,424 · prior 12 97,862(+3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EP Energy E&P Company, LLCApr 2023 → Feb 2025
- 2Verdun Oil EF II LLCMar 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 886939-98 | Drill | EP Energy E&P Company, LLC | Mar 22, 2023 | Jan 5, 2023 | Jan 14, 2023 | 9,500 |
| 886939-99 | Drill | EP Energy E&P Company, LLC | Jan 3, 2023 | Jan 5, 2023 | — | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-298657 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 500 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxWILCOX - DISPOSAL | 3,097 | -2,597 |
| Austin Chalk | 8,837 | -8,337 |
| Eagle FordEAGLE FORD - H2S | 9,123 | -8,623 |
| BudaBUDA - H2S | — | — |
| EdwardsEDWARDS - H2S | — | — |
| Escondido | — | — |
| OlmosOLMOS - DISPOSAL | — | — |
| Queen City | — | — |
| Sparta | — | — |
| Yegua | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,450 | 16,301 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,574 | 12.25 | 5,555 S |
| 5.5 | 16,442 | 8.75 | 5,555 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 3, 2025 | Dec 16, 2024 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-37389 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-37389 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Altito a 25A Allocation B42-283-37390
0.0 KM · EP Energy E&P Company, LLC · Section with this well →
| Wilcox | 3,088 | -2,588 |
| Austin Chalk | 7,984 | -7,484 |
| Eagle Ford | 8,813 | -8,313 |
| Edwards | — | |
| Olmos | — | |
| Yegua | — | |
| Escondido | — | |
| Buda | — |
10 TOPS · FIRST 8
Altito a 25A Allocation C42-283-37408
0.0 KM · EP Energy E&P Company, LLC · Section with this well →
| Wilcox | 3,088 | -2,588 |
| Austin Chalk | 8,832 | -8,332 |
| Eagle Ford | 8,844 | -8,344 |
| Escondido | — | |
| Olmos | — | |
| Sparta | — | |
| Yegua | — | |
| Queen City | — |
10 TOPS · FIRST 8
Altito a D42-283-37747
0.8 KM · EP Energy E&P Company, LLC · Section with this well →
| Escondido | 8,496 | -8,012 |
| Austin Chalk | 8,766 | -8,282 |
| Eagle Ford | 9,080 | -8,596 |
| Sparta | — | |
| Yegua | — | |
| Wilcox | — | |
| Queen City | — | |
| Olmos | — |
10 TOPS · FIRST 8
Altito a E42-283-37748
0.8 KM · EP Energy E&P Company, LLC · Section with this well →
| Escondido | 8,496 | -8,012 |
| Austin Chalk | 8,766 | -8,282 |
| Eagle Ford | 9,153 | -8,669 |
| Olmos | — | |
| Queen City | — | |
| Sparta | — | |
| Wilcox | — | |
| Yegua | — |
10 TOPS · FIRST 8
Altito a 27B Unit42-283-36225
1.5 KM · EP Energy E&P Company, L.P. · Section with this well →
| Queen City | 1,379 | -910 |
| Wilcox | 1,689 | -1,220 |
| Escondido | 5,448 | -4,979 |
| Olmos | 6,739 | -6,270 |
| Austin Chalk | 8,744 | -8,275 |
| Eagle Ford | 9,020 | -8,551 |
| Yegua | — | |
| Buda | — |
11 TOPS · FIRST 8
Altito a 27B Unit42-283-36224
1.5 KM · EP Energy E&P Company, L.P. · Section with this well →
| Queen City | 1,353 | -884 |
| Wilcox | 2,663 | -2,194 |
| Escondido | 5,444 | -4,975 |
| Olmos | 6,760 | -6,291 |
| Austin Chalk | 8,744 | -8,275 |
| Eagle Ford | 9,020 | -8,551 |
| Edwards | — | |
| Sparta | — |
10 TOPS · FIRST 8
Altito a 27B Unit42-283-36226
1.5 KM · EP Energy E&P Company, L.P. · Section with this well →
| Queen City | 1,380 | -911 |
| Wilcox | 2,690 | -2,221 |
| Escondido | 5,442 | -4,973 |
| Olmos | 6,759 | -6,290 |
| Austin Chalk | 8,728 | -8,259 |
| Eagle Ford | 9,009 | -8,540 |
| Buda | — | |
| Yegua | — |
10 TOPS · FIRST 8
Altito a 2728 Allocation42-283-36283
1.5 KM · EP Energy E&P Company, L.P. · Section with this well →
| Queen City | 1,376 | -908 |
| Wilcox | 2,686 | -2,218 |
| Escondido | 5,426 | -4,958 |
| Olmos | 6,759 | -6,291 |
| Austin Chalk | 8,714 | -8,246 |
| Eagle Ford | 8,991 | -8,523 |
| Yegua | — | |
| Edwards | — |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28337389, documented in the API reference.