WELL · 42-285-30480 · DISTRICT 2

Williams Cecil #1D

Plugged

Lavaca County · Hope (Wilcox 10300) field  · Vertical

Williams Cecil #1D (API 42-285-30480) is a plugged well in Lavaca County, plugged June 3, 1997, last operated by Cico Oil & Gas Company.

The RRC has issued 2 drilling permits between 1981 and 1999, permitted to 11,496 ft.

Completion filings report 6 formation tops, including Miocene (undifferentiated), Frio, Vicksburg, Yegua.

It holds an active disposal or injection permit, with 5.95K barrels injected in the 12 months reported through November 2025.

Operator of record

Cico Oil & Gas Company

Houston, TX · P-5 Y, filed Dec 6, 2019 · 227 permits on file · (713) 783-0400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCico Oil & Gas Company
Production reportsCico Oil & Gas Companythrough Oct 1995
Latest permitCico Oil & Gas Co.Nov 22, 1999
11,496
total depth, ft
2
permits on file
Nov 22, 1999
last permit issued
—
completed
0
cumulative oil, bbl
3.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 3, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams G-2-175395Hope (Wilcox 8800)Messy Oil and Gas, LLC100Dec 1999 – Jul 2026
Williams, Cecil G-2-118982Hope (Wilcox 8800)Cico Oil & Gas Company103.9KJan 1993 – Jun 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cico Oil & Gas CompanyJan 1993 → Oct 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489592-99ReenterCico Oil & Gas Co.Nov 17, 1999Nov 22, 1999Nov 24, 19993,999
123213-99RecompletionCico Oil & Gas Co.Jun 30, 1981Jun 30, 1981—11,496

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-118982————
—— G-2-175395————

Formation tops

As filed on W-2/G-1. Subsea from 202 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE840-638
Frio2,665-2,463
Vicksburg3,160-2,958
Yegua4,740-4,538
Cockfield4,880-4,678
Wilcox7,600-7,398

Perforations

Perforated and open-hole intervals.

FromToType
3,5083,518Perforated
8,8088,814Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7554015512 S
4.53,2674.75170 S
2.3758,735——
79,0049.8751,630 S
79,0059.875420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 24, 2003Dec 9, 2002—
00Feb 22, 2000Jan 3, 2000—
00Jan 25, 2000——
00Dec 18, 1985Nov 14, 1985—
00Dec 13, 1985——
00Jan 12, 1984Oct 11, 1983—
00Jan 12, 1984Jul 3, 1981—
00Jan 12, 1984Nov 7, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.95K
bbl, last 12 reported months
2.88M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089444W-14 DisposalActive1,0001,0003,334–3,602

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,945 · prior 12 21,490(-72%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28530480, documented in the API reference.