WELL · 42-285-31213 · DISTRICT 2

Julius Technik Unit #2 #2

N

Lavaca County  · Vertical

Julius Technik Unit #2 #2 (API 42-285-31213) is a permitted well in Lavaca County filed by Howell Drilling, Inc.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1977 and 1986, permitted to 10,271 ft.

Completion filings report 2 formation tops, including Wilcox, Top Hallettsville.

Operator of record

Howell Drilling, Inc.

San Antonio, TX · P-5 Y, filed Mar 22, 2001 · 176 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMB Energy, LLCthrough Mar 2026
Latest permitHowell Drilling, Inc.Mar 21, 1986
10,271
total depth, ft
5
permits on file
Mar 21, 1986
last permit issued
—
completed
0
cumulative oil, bbl
134K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Technik, Julius Unit #2 G-2-121019Charlie Daubert (9700)MB Energy, LLC10134KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 1,337 · prior 12 1,681(-20%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Howell Drilling, Inc.Jan 1993 → Dec 1993
  2. 2Parker & Parsley Development Co.Jan 1994 → Feb 1995
  3. 3Parker & Parsley Development L.PMar 1995 → Aug 1997
  4. 4Pioneer Natural Res. USA, Inc.Sep 1997 → Sep 2012
  5. 5Prize Operating CompanyJul 1999 → Mar 2002
  6. 6Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  7. 7Cimarex Energy Co. of ColoradoMay 2006 → Nov 2008
  8. 8Inland Ocean, Inc.Oct 2012 → May 2021
  9. 9MB Energy, LLCDec 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300282-99RecompletionHowell Drilling, Inc.Mar 21, 1986Mar 21, 1986—10,050
300281-99RecompletionHowell Drilling, Inc.Mar 21, 1986Mar 21, 1986—10,050
225987-99RecompletionHowell Drilling, Inc.Sep 16, 1983Dec 30, 1983—10,271
23177-99RecompletionHowell Drilling, Inc.Apr 28, 1978Apr 28, 1978—10,200
9555-99DrillHowell Drilling, Inc.Oct 12, 1977Oct 12, 1977—10,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-121019————

Formation tops

As filed on W-2/G-1. Subsea from 297 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxTOP WILCOX5,580-5,283
Top Hallettsville7,708-7,411

Perforations

Perforated and open-hole intervals.

FromToType
7,3137,316Perforated
7,7057,710Perforated
8,3508,354Perforated
9,7119,736Perforated
9,7439,760Perforated
9,7699,776Perforated
9,7849,788Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,83214.751,349 S
10.751,832—1,349 S
2.3758,236——
2.3758,403——
7.62510,2719.8751,240 S
7.62510,271—1,240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 1986May 5, 1986Yes
00Jun 4, 1986——
00Jan 26, 1984Sep 20, 1983—
00Jan 12, 1984Dec 29, 1978—
00Jan 12, 1984May 22, 1978—
00Jan 12, 1984Jan 3, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28531213, documented in the API reference.