WELL · 42-285-31303 · DISTRICT 2
Majors SWD #1
Lavaca County · Ryan (Wilcox 10 600) field · Vertical
Majors Swd #1 (API 42-285-31303) is a plugged well in Lavaca County, plugged September 16, 2010, last operated by El Paso E & P Company L. P..
The RRC has issued 2 drilling permits between 1978 and 1998, permitted to 12,000 ft.
It was permitted by Coastal Oil & Gas Corporation and has since transferred to El Paso E & P Company L. P. on the wellbore schedule.
Operator of record
Permitted by Coastal Oil & Gas Corporation; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 6, 2015 · 582 permits on file · (713) 420-2600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EL Paso E & P Company L. P. |
| Production reports | none |
| Latest permit | Coastal Oil & Gas CorporationJul 24, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 2
- permits on file
- Jul 24, 1998
- last permit issued
- Aug 17, 1998
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1998 THROUGH Sep 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 17, 1998
- Shut in
- —
- Plugged
- Sep 16, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Majors SWD G-2-176330 | Ryan (Wilcox 10,600) | EL Paso E & P Company, L. P. | 1 | 0 | 0 | Aug 1998 – Sep 2010 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 478220-99 | Reenter | Coastal Oil & Gas Corporation | Jul 24, 1998 | Jul 24, 1998 | Aug 10, 1998 | 3,500 |
| 25251-99 | Drill | Ladd Petroleum Corp. | May 25, 1978 | May 25, 1978 | — | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-176330 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,836 | 2,853 | Perforated |
| 2,896 | 2,916 | Perforated |
| 3,070 | 3,080 | Perforated |
| 10,600 | 11,329 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 3,420 | 9.875 | 760 S |
| 10.75 | 3,526 | 14.75 | 1,835 S |
| 2.375 | 10,577 | — | — |
| 7 | 12,018 | 9.875 | 975 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 9, 2000 | Apr 5, 2000 | — |
| 00 | Apr 5, 2000 | — | — |
| 00 | Jan 12, 1984 | Jun 5, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-31303 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-31303 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 148K
- bbl, all reported
- Nov 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088314 | W-14 Disposal | Plugged Oct 8, 2010 | 4,000 | 1,400 | 2,800–3,200 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28531303, documented in the API reference.