WELL · 42-285-31424 · DISTRICT 2
Melnar Lillie #1
Lavaca County · Word (Wilcox Lower) field · Vertical
Melnar Lillie #1 (API 42-285-31424) is a well in Lavaca County operated by Getty Oil CO., completed November 26, 1980.
The RRC has issued one drilling permit, issued August 10, 1979, permitted to 9,550 ft.
Its lease has reported 85.9K barrels of oil and 35.7K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Midland, TX · P-5 Inactive, filed Mar 27, 1989 · 1,564 permits on file · (432) 688-4100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Getty Oil Co. |
| Production reports | Capital Star Oil & Gas, Inc.through Apr 2026 |
| Latest permit | Getty Oil Co.Aug 10, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,550
- total depth, ft
- 1
- permits on file
- Aug 10, 1979
- last permit issued
- Nov 26, 1980
- completed
- 85.9K
- cumulative oil, bbl
- 35.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 26, 1980
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Melnar, Lillie O-2-6271 | WORD(8650) | Capital Star Oil & Gas, Inc. | 1 | 85.9K | 35.7K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,384 · prior 12 1,309(+82%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Aug 1994
- 2Apache CorporationSep 1994 → Mar 1998
- 3Tri-Union Development Corp.Apr 1998 → Mar 2004
- 4Texcal Energy (GP) LLCDec 2004 → May 2010
- 5Milagro Exploration, LLCOct 2010 → Oct 2015
- 6White Oak Operating Company LLCNov 2015 → Sep 2019
- 7Wagner Oil CompanyOct 2019 → Jan 2021
- 8Fletcher Operating, LLCFeb 2021 → May 2024
- 9Capital Star Oil & Gas, Inc.Jun 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 55222-99 | Drill | Getty Oil Co. | Aug 10, 1979 | Aug 10, 1979 | Oct 21, 1979 | 9,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-6271 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,652 | 8,658 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 68 | 16 | — |
| 9.625 | 2,636 | 12.25 | 500 S |
| 2.875 | 8,505 | — | — |
| 5.5 | 9,532 | 8.75 | 580 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 1, 1992 | Sep 30, 1992 | — |
| 00 | Jan 12, 1984 | Dec 29, 1980 | — |
| 00 | Jan 12, 1984 | Dec 9, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-31424 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-31424 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28531424, documented in the API reference.