WELL · 42-285-32187 · DISTRICT 2

Frates E. C.-Zoch #1

Plugged

Lavaca County · Speaks SW. (2850) field  · Vertical

Frates E. C.-Zoch #1 (API 42-285-32187) is a plugged well in Lavaca County, plugged August 28, 2009, last operated by Vermillion Production Inc..

The RRC has issued 3 drilling permits between 1993 and 1999, permitted to 6,000 ft.

It was permitted by Petro-Hunt, L.L.C. and has since transferred to Vermillion Production Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Yegua.

Operator of record

Vermillion Production Inc.

Permitted by Petro-Hunt, L.L.C.; the EWA schedule now lists a different operator.

Pearsall, TX · P-5 Y, filed Oct 4, 2025 · 1 permits on file · (830) 334-4501

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVermillion Production Inc.
Production reportsVermillion Production, Inc.through Apr 2009
Latest permitPetro-Hunt, L.L.C.Mar 15, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
3
permits on file
Mar 15, 1999
last permit issued
Feb 12, 1999
completed
0
cumulative oil, bbl
773K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1993 THROUGH Aug 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 12, 1999
Shut in
—
Plugged
Aug 28, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Frates, E. C.-Zoch G-2-173066Speaks, SW. (2850)Vermillion Production, Inc.10289KFeb 1999 – Aug 2009
Zoch-Frates E. C. G-2-146090Nellie (Yegua)Petro-Hunt, L.L.C.10420KJul 1993 – Feb 1999
Frates-Zoch, E. C. G-2-166299Speaks, SW. (Yegua 5200)Petro-Hunt, L.L.C.1064.9KOct 1997 – Feb 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Alyana Energy CorporationSep 1993 → Apr 1995
  2. 2Hunt, Wm. Herbert, Trust Est.May 1995 → Sep 1998
  3. 3Petro-Hunt, L.L.C.Oct 1998 → Feb 2005
  4. 4Vermillion Production, Inc.Dec 2006 → Apr 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483143-99RecompletionPetro-Hunt, L.L.C.Mar 8, 1999Mar 15, 1999Feb 1, 19992,850
470398-99RecompletionHunt, Wm. Herbert, Trust Est.Nov 21, 1997Dec 2, 1997Oct 23, 19975,270
410618-99DrillAlyana Energy CorporationApr 9, 1993Apr 12, 1993Jun 7, 19936,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-146090————
—— G-2-166299————
—— G-2-173066————

Formation tops

As filed on W-2/G-1. Subsea from 176 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1,800-1,624
Yegua4,900-4,724

Perforations

Perforated and open-hole intervals.

FromToType
2,8142,816Perforated
5,0595,064Perforated
5,4005,404Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62561212.25230 S
4.56,0017.875280 S
4.5—7.875730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 28, 1999Mar 8, 1999Yes
00Jun 14, 1999——
00Jun 17, 1998Nov 20, 1997Yes
00Feb 5, 1998——
00Oct 14, 1993Jul 30, 1993Yes
00Aug 13, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28532187, documented in the API reference.