WELL · 42-285-32239 · DISTRICT 2

1ST Victoria National Bank #1

Plugged

Lavaca County · Chicolete Creek North (3030) field  · Vertical

1st Victoria National Bank #1 (API 42-285-32239) is a plugged well in Lavaca County, plugged January 23, 1996, last operated by Jackson Petroleum Consulting Inc.

The RRC has issued one drilling permit (amended once), issued April 7, 1994, permitted to 4,400 ft.

Completion filings report one formation top, including Frio.

Operator of record

Jackson Petroleum Consulting Inc

Plano, TX · P-5 Y, filed May 12, 2020 · 5 permits on file · (972) 672-1612

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJackson Petroleum Consulting Inc
Production reportsJackson Petroleum Consulting,incthrough Jul 1995
Latest permitJackson Petroleum Consulting,incApr 7, 1994
4,400
total depth, ft
2
permits on file
Apr 7, 1994
last permit issued
Sep 6, 1995
completed
0
cumulative oil, bbl
118K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Mar 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 6, 1995
Shut in
—
Plugged
Jan 23, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
1ST Victoria National Bank G-2-151420Chicolete Creek, North (3030)Jackson Petroleum Consulting,inc10118KMay 1994 – Mar 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jackson Petroleum Consulting,incJun 1994 → Jul 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422753-98Field transferJackson Petroleum Consulting,incOct 10, 1994Apr 7, 1994—4,400
422753-99DrillJackson Petroleum Consulting,incApr 6, 1994Apr 7, 1994May 8, 19944,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-151420————

Formation tops

As filed on W-2/G-1. Subsea from 150 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO 3030 SAND3,030-2,880

Perforations

Perforated and open-hole intervals.

FromToType
1,5171,552Perforated
1,9901,993Perforated
3,0343,042Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546112.25181 S
5.53,1727.875470 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 1996Oct 12, 1995Yes
00Jan 24, 1995Aug 1, 1994Yes
00Oct 27, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28532239, documented in the API reference.