WELL · 42-285-32344 · DISTRICT 2
Jacobs #2
Lavaca County · Hope (Vicksburg 3400) field · Vertical
Jacobs #2 (API 42-285-32344) is a plugged well in Lavaca County, plugged July 27, 2012, last operated by Bishop J. E. Inc..
The RRC has issued 4 drilling permits between 1995 and 2003, permitted to 3,500 ft.
Completion filings report 3 formation tops, including Frio, Vicksburg, Vksb.
Operator of record
Houston, TX · P-5 Y, filed Jun 8, 2012 · 49 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bishop J. E. Inc. |
| Production reports | Bishop, J. E., Inc.through Sep 2011 |
| Latest permit | Bishop, J. E. Inc.Aug 25, 2003 |
- 3,500
- total depth, ft
- 4
- permits on file
- Aug 25, 2003
- last permit issued
- Dec 15, 1995
- completed
- 0
- cumulative oil, bbl
- 1.84M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1995 THROUGH Jul 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 15, 1995
- Shut in
- —
- Plugged
- Jul 27, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jacobs G-2-157411 | Hope (Vicksburg 3400) | Bishop, J. E., Inc. | 1 | 0 | 182K | Dec 1995 – Jul 2012 |
| Jacobs G-2-180563 | Hope (Jacobs 2980) | Bishop, J. E., Inc. | 1 | 0 | 433K | Sep 2000 – Jul 2012 |
| Jacobs G-2-198547 | Hope (Miocene 2660) | Bishop, J. E., Inc. | 1 | 0 | 792K | Jul 2003 – Jul 2012 |
| Jacobs G-2-164647 | Hope (Miocene 3060) | Bishop, J. E., Inc. | 1 | 0 | 428K | May 1997 – Sep 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bishop, J. E., Inc.Dec 1995 → Sep 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 535623-99 | Recompletion | Bishop, J. E. Inc. | Aug 21, 2003 | Aug 25, 2003 | Jul 21, 2003 | 2,647 |
| 497161-99 | Recompletion | Bishop, J. E. Inc. | Jul 13, 2000 | Jul 24, 2000 | Sep 1, 2000 | 3,240 |
| 466393-99 | Recompletion | Bishop, J. E. Inc. | Aug 18, 1997 | Aug 20, 1997 | May 16, 1997 | 3,240 |
| 442237-99 | Drill | Bishop, J. E. Inc. | Nov 27, 1995 | Dec 1, 1995 | Dec 4, 1995 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-157411 | — | — | — | — |
| — | — G-2-164647 | — | — | — | — |
| — | — G-2-180563 | — | — | — | — |
| — | — G-2-198547 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,605 | 2,612 | Perforated |
| 2,849 | 2,859 | Perforated |
| 2,992 | 2,995 | Perforated |
| 3,403 | 3,405 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 352 | 12.25 | 190 S |
| 4.5 | 3,487 | 7.875 | 340 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 18, 2004 | Aug 25, 2003 | Yes |
| 00 | Jan 22, 2004 | — | — |
| 00 | Aug 2, 2001 | Sep 25, 2000 | Yes |
| 00 | Feb 6, 2001 | — | — |
| 00 | Jan 22, 1998 | Jun 17, 1997 | Yes |
| 00 | Oct 8, 1997 | — | — |
| 00 | May 31, 1996 | Dec 29, 1995 | Yes |
| 00 | Mar 28, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-32344 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-32344 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28532344, documented in the API reference.