WELL · 42-285-32597 · DISTRICT 2
Bernice Karl et al GU #1
Lavaca County · Hope (Wilcox 7700) field · Vertical
Bernice Karl ET AL GU #1 (API 42-285-32597) is a plugged well in Lavaca County, plugged December 1, 2006, last operated by Peoples Energy Prod.-TX L.P..
The RRC has issued one drilling permit (amended once), issued April 17, 1998, permitted to 9,000 ft.
It was permitted by Union Gas Operating Company and has since transferred to Peoples Energy Prod.-TX L.P. on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.
Operator of record
Permitted by Union Gas Operating Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 3, 2012 · 272 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Peoples Energy Prod.-TX L.P. |
| Production reports | Peoples Energy Prod.-TX, L.P.through Apr 2004 |
| Latest permit | Union Gas Operating CompanyApr 17, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- Apr 17, 1998
- last permit issued
- Aug 30, 1999
- completed
- 0
- cumulative oil, bbl
- 777K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1998 THROUGH Nov 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 30, 1999
- Shut in
- —
- Plugged
- Dec 1, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bernice Karl et al GU G-2-171009 | Hope (Wilcox 7700) | Peoples Energy Prod.-TX, L.P. | 1 | 0 | 777K | May 1998 – Nov 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Gas Operating CompanyMay 1998 → Jun 1999
- 2Coastal Oil & Gas CorporationJul 1999 → Oct 1999
- 3Texas Onshore Energy, Inc.Oct 2001 → Jan 2002
- 4Gcea, LLCJun 2002 → Oct 2003
- 5Peoples Energy Prod.-TX, L.P.Nov 2003 → Apr 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 475433-98 | Drill | Union Gas Operating Company | Jun 18, 1998 | Apr 17, 1998 | — | 9,000 |
| 475433-99 | Drill | Union Gas Operating Company | Apr 17, 1998 | Apr 17, 1998 | Apr 25, 1998 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-171009 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 201 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,722 | 7,726 | Perforated |
| 7,837 | 7,841 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,935 | 12.25 | 865 S |
| 4.5 | 8,025 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 7, 2000 | Oct 18, 1999 | — |
| 00 | Mar 1, 1999 | Jun 18, 1998 | Yes |
| 00 | Dec 10, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-32597 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-32597 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28532597, documented in the API reference.