WELL · 42-285-32798 · DISTRICT 2

Rochelle #4

Y

Lavaca County · Dry Hollow (Rainbow Sand) field · Temp Abandoned  · Vertical

Rochelle #4 (API 42-285-32798) is a well in Lavaca County operated by Proline Energy Resources Inc, completed February 5, 2012 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits between 2000 and 2003, permitted to 16,000 ft.

It was permitted by Wynn-Crosby Energy, Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Peck, Dagg.

No lease production has been reported under this well’s leases.

Operator of record

Proline Energy Resources Inc

Permitted by Wynn-Crosby Energy, Inc.; the EWA schedule now lists a different operator.

Sugar Land, TX · P-5 Y, filed Jul 4, 2026 · (832) 930-4455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsMilagro Exploration, LLCthrough Jun 2013
Latest permitWynn-Crosby Energy, Inc.Aug 8, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,000
total depth, ft
2
permits on file
Aug 8, 2003
last permit issued
Feb 5, 2012
completed
0
cumulative oil, bbl
8.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 5, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rochelle G-2-183156Dry Hollow (13,900 Wilcox)Proline Energy Resources Inc107.68MOct 2000 – Jul 2026
Rochelle G-2-212420Dry Hollow (Rainbow Sand)Proline Energy Resources Inc10459KSep 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wynn-Crosby Energy, Inc.Oct 2000 → Aug 2003
  2. 2Petrohawk Operating CompanySep 2003 → Nov 2007
  3. 3Milagro Exploration, LLCDec 2007 → Jun 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535107-99RecompletionWynn-Crosby Energy, Inc.Aug 8, 2003Aug 8, 2003—16,000
495918-99DrillWynn-Crosby Energy, Inc.Jun 7, 2000Jun 7, 2000Jun 27, 200016,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-183156————
—— G-2-212420————

Formation tops

As filed on W-2/G-1. Subsea from 152 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox7,900-7,748
Peck11,240-11,088
Dagg11,870-11,718
WilcoxWILCOX MASSIVE14,180-14,028

Perforations

Perforated and open-hole intervals.

FromToType
12,86312,866Perforated
12,87912,900Perforated
13,84813,857Perforated
13,93013,933Perforated
13,96413,968Perforated
13,96414,048Perforated
14,00314,013Perforated
14,03114,048Perforated
14,25914,269Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,48017.51,965 S
9.62510,14312.251,075 S
515,4606.51,030 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 22, 2013Feb 6, 2012—
00Feb 8, 2006Jun 24, 2005Yes
00Dec 1, 2005——
00Sep 11, 2001Jan 29, 2001Yes
00Jul 13, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28532798, documented in the API reference.