WELL · 42-285-32959 · DISTRICT 2

Geo-Hope #3

Y

Lavaca County · Hope (Miocene 2500) field · Producing  · Vertical

Geo-Hope #3 (API 42-285-32959) is a well in Lavaca County operated by Central Gulf Petroleum Inc, completed May 16, 2002 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 24, 2002, permitted to 3,500 ft.

It was permitted by Geonatural Resources, Inc. and has since transferred to Central Gulf Petroleum Inc on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Central Gulf Petroleum Inc

Permitted by Geonatural Resources, Inc.; the EWA schedule now lists a different operator.

The Woodlands, TX · P-5 Y, filed Apr 4, 2026 · 10 permits on file · (512) 595-6469

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCentral Gulf Petroleum Inc
Production reportsCentral Gulf Petroleum Incthrough May 2025
Latest permitGeonatural Resources, Inc.Apr 24, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Apr 24, 2002
last permit issued
May 16, 2002
completed
0
cumulative oil, bbl
126K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 16, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Geo-Hope G-2-190685Hope (Miocene 2500)Central Gulf Petroleum Inc10126KMay 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 180 · prior 12 825(-78%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geonatural Resources, Inc.Jun 2002 → Jun 2004
  2. 2Central Gulf Petroleum IncDec 2024 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
519401-99DrillGeonatural Resources, Inc.Apr 24, 2002Apr 24, 2002Apr 27, 20023,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-190685————

Perforations

Perforated and open-hole intervals.

FromToType
2,5642,570Perforated
2,5812,583Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536812.25210 S
4.53,1927.875565 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 31, 2002Jun 13, 2002Yes
00Oct 3, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28532959, documented in the API reference.