WELL · 42-285-33032 · DISTRICT 2

Jacobs Ranch #11

Plugged

Lavaca County · The Rapture (Wilcox) field  · Vertical

Jacobs Ranch #11 (API 42-285-33032) is a plugged well in Lavaca County, plugged June 22, 2009, last operated by Texcal Energy (GP) LLC.

The RRC has issued one drilling permit (amended twice), issued September 4, 2003, permitted to 16,000 ft.

It was permitted by Denali Oil & Gas Management, LLC and has since transferred to Texcal Energy (GP) LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Jackson, Yequa, Wilcox, The Rapture (Wilcox).

Operator of record

Texcal Energy (GP) LLC

Permitted by Denali Oil & Gas Management, LLC; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed Jul 3, 2010 · 26 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexcal Energy (GP) LLC
Production reportsTexcal Energy (GP) LLCthrough Jun 2009
Latest permitDenali Oil & Gas Management, LLCSep 4, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,000
total depth, ft
3
permits on file
Sep 4, 2003
last permit issued
Sep 6, 2004
completed
0
cumulative oil, bbl
2.96M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2004 THROUGH Sep 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 6, 2004
Shut in
—
Plugged
Jun 22, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jacobs Ranch G-2-202437The Rapture (Wilcox)Texcal Energy (GP) LLC102.95MApr 2004 – Sep 2010
Henderson et al Gas Unit G-2-203308The Rapture (Magnolia)Texcal Energy (GP) LLC1012.4KApr 2004 – Jun 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Denali Oil & Gas Management, LLCApr 2004 → Oct 2004
  2. 2Pogo Producing CompanyNov 2004 → Mar 2007
  3. 3Texcal Energy (GP) LLCApr 2007 → Jun 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
536076-97DrillDenali Oil & Gas Management, LLCJun 23, 2004Sep 4, 2003—16,000
536076-98DrillDenali Oil & Gas Management, LLCMay 25, 2004Sep 4, 2003—16,000
536076-99DrillDenali Oil & Gas Management, LLCSep 4, 2003Sep 4, 2003Dec 18, 200316,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-202437————
—— G-2-203308————

Formation tops

As filed on W-2/G-1. Subsea from 177 ft elevation.Download CSV →

FormationMD ftSubsea
Jackson4,500-4,323
Yequa5,500-5,323
Wilcox8,500-8,323
WilcoxWILCOX (8500)8,500-8,323
The Rapture (Wilcox)14,000-13,823
The Rapture (Magnolia)15,000-14,823

Perforations

Perforated and open-hole intervals.

FromToType
14,01914,031Perforated
14,08614,146Perforated
15,17415,216Perforated
15,54515,733Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,50517.51,690 S
9.62510,60012.252,035 S
9.62510,60012.52,035 S
516,0006.5900 S
4.516,0006.5900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2005Jul 1, 2004—
00Jan 25, 2005Oct 8, 2004—
00Dec 3, 2004May 27, 2004Yes
00Sep 14, 2004——
00Jul 27, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28533032, documented in the API reference.