WELL · 42-285-33135 · DISTRICT 2
Mueller Gas Unit #1
Lavaca County · Hallettsville East (9800) field · Vertical
Mueller Gas Unit #1 (API 42-285-33135) is a plugged well in Lavaca County, plugged April 13, 2009, last operated by Live Oak OP & Production L.L.C..
The RRC has issued one drilling permit, issued March 14, 2005, permitted to 9,850 ft.
It was permitted by Ipact and has since transferred to Live Oak OP & Production L.L.C. on the wellbore schedule.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Operator of record
Live Oak OP & Production L.L.C.
Permitted by Ipact; the EWA schedule now lists a different operator.
Austin, TX · P-5 Y, filed Jan 6, 2012 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Live Oak OP & Production L.L.C. |
| Production reports | Ipactthrough Nov 2008 |
| Latest permit | IpactMar 14, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,850
- total depth, ft
- 1
- permits on file
- Mar 14, 2005
- last permit issued
- Jun 23, 2005
- completed
- 0
- cumulative oil, bbl
- 32.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Nov 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 23, 2005
- Shut in
- —
- Plugged
- Apr 13, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mueller Gas Unit G-2-212596 | Hallettsville, East (9800) | Live Oak OP & Production, L.L.C. | 1 | 0 | 32.6K | Jun 2005 – Nov 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1IpactJul 2005 → Nov 2008
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-212596 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 210 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,655 | 9,666 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,736 | 12.25 | 690 S |
| 5.5 | 9,861 | 8.75 | 411 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 27, 2006 | Jul 18, 2005 | Yes |
| 00 | Dec 12, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33135 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33135 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533135, documented in the API reference.