WELL · 42-285-33421 · DISTRICT 2
Williams #1
Lavaca County · Hope (Wilcox Massive) field · Temp Abandoned · Vertical
Williams #1 (API 42-285-33421) is a well in Lavaca County operated by TC Oil And Gas LLC, completed March 20, 2008 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued August 16, 2007, permitted to 15,015 ft.
It was permitted by Lamay Corporation and has since transferred to TC Oil And Gas LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Lamay Corporation; the EWA schedule now lists a different operator.
Denton, TX · P-5 Y, filed Feb 4, 2026 · (214) 407-4525
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TC Oil and Gas LLC |
| Production reports | Lamay Corporationthrough Sep 2010 |
| Latest permit | Lamay CorporationAug 16, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,015
- total depth, ft
- 2
- permits on file
- Aug 16, 2007
- last permit issued
- Mar 20, 2008
- completed
- 0
- cumulative oil, bbl
- 180K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 20, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams G-2-235534 | Hope (Wilcox Massive) | TC Oil and Gas, LLC | 1 | 0 | 180K | Mar 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lamay CorporationMay 2008 → Sep 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 644318-98 | Drill | Lamay Corporation | Aug 27, 2007 | Aug 16, 2007 | Sep 21, 2007 | 15,015 |
| 644318-99 | Drill | Lamay Corporation | Aug 13, 2007 | Aug 16, 2007 | Sep 21, 2007 | 15,015 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-235534 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 187 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,437 | 12,447 | Perforated |
| 12,478 | 12,488 | Perforated |
| 12,553 | 12,563 | Perforated |
| 12,748 | 12,755 | Perforated |
| 12,826 | 12,836 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,729 | 17.5 | 2,485 S |
| 7.625 | 10,429 | 8.5 | 100 S |
| 9.625 | 10,745 | 12.25 | 755 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 30, 2008 | Apr 28, 2008 | Yes |
| 00 | Jun 2, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33421 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33421 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533421, documented in the API reference.