WELL · 42-285-33618 · DISTRICT 2

Carol Unit #1

N

Lavaca County · Eagleville (Eagle Ford-2) field  · Horizontal

Carol Unit #1 (API 42-285-33618) is a horizontal well in Lavaca County operated by Penn Virginia Oil & Gas L.P., completed May 20, 2012.

The RRC has issued one drilling permit, issued December 22, 2011, permitted to 13,500 ft.

It was permitted by Geosouthern Energy Corporation and has since transferred to Penn Virginia Oil & Gas L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

Its 2 leases have reported 117K barrels of oil and 295K mcf of gas since April 2012, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Penn Virginia Oil & Gas L.P.

Permitted by Geosouthern Energy Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 1,157 permits on file · (888) 292-5017

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePenn Virginia Oil & Gas L.P.
Production reportsBaytex Energy USA, Inc.through Dec 2024
Latest permitGeosouthern Energy CorporationDec 22, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
1
permits on file
Dec 22, 2011
last permit issued
May 20, 2012
completed
117K
cumulative oil, bbl
295K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 2012
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carol Unit G-2-291046Eagleville (Eagle Ford-2)FW Eagle Ford I, LLC1020.9KSep 2019 – Jul 2026
Carol Unit O-2-10099Eagleville (Eagle Ford-2)Penn Virginia Oil & Gas, L.P.1117K274KApr 2012 – Oct 2021

Gas, mcf lease total

Last 12 months 0 · prior 12 1,902(-100%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geosouthern Energy CorporationMay 2012 → Feb 2014
  2. 2Devon Energy Production Co, L.P.Mar 2014 → Sep 2017
  3. 3Penn Virginia Oil & Gas, L.P.Oct 2017 → Feb 2021
  4. 4Baytex Energy USA, Inc.Dec 2024 → Dec 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
730296-99DrillGeosouthern Energy CorporationDec 19, 2011Dec 22, 2011Feb 6, 201213,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-291046————
—— O-2-10099————

Formation tops

As filed on W-2/G-1. Subsea from 459 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap11,211-10,752
Austin Chalk11,472-11,013
Eagle Ford12,122-11,663
Eagle FordEAGLEFORD12,122-11,663

Perforations

Perforated and open-hole intervals.

FromToType
12,22518,095Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,50814.751,990 S
5.511,5066.751,120 S
7.62511,7808.75435 S
4.518,1976.751,120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 21, 2022Nov 17, 2022—
00Jul 29, 2021Jul 7, 2021—
00Apr 29, 2013Feb 27, 2013Yes
00Sep 28, 2012Aug 16, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28533618, documented in the API reference.