WELL · 42-285-33658 · DISTRICT 2
Smith Unit #1H
Lavaca County · Eagleville (Eagle Ford-2) field · Horizontal
Smith Unit #1H (API 42-285-33658) is a plugged horizontal well in Lavaca County, plugged November 3, 2022, last operated by Rocc Oil & Gas L.P..
The RRC has issued one drilling permit, issued August 20, 2012, permitted to 14,000 ft.
It was permitted by Penn Virginia Oil & Gas, L.P. and has since transferred to Rocc Oil & Gas L.P. on the wellbore schedule.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
Its lease has reported 120K barrels of oil and 215K mcf of gas since October 2012, last reporting in August 2023.
Operator of record
Permitted by Penn Virginia Oil & Gas, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Sep 6, 2024 · 49 permits on file · (888) 292-5017
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rocc Oil & Gas L.P. |
| Production reports | Penn Virginia Oil & Gas, L.P.through Aug 2020 |
| Latest permit | Penn Virginia Oil & Gas, L.P.Aug 20, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 1
- permits on file
- Aug 20, 2012
- last permit issued
- Oct 29, 2012
- completed
- 120K
- cumulative oil, bbl
- 215K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Aug 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 29, 2012
- Shut in
- —
- Plugged
- Nov 3, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smith Unit O-2-10224 | Eagleville (Eagle Ford-2) | Rocc Oil & Gas, L.P. | 1 | 120K | 215K | Oct 2012 – Aug 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Penn Virginia Oil & Gas, L.P.Oct 2012 → Aug 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 746262-99 | Drill | Penn Virginia Oil & Gas, L.P. | Aug 10, 2012 | Aug 20, 2012 | Aug 30, 2012 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-10224 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 447 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 10,787 | -10,340 |
| Austin Chalk | 11,032 | -10,585 |
| Eagle Ford | 11,725 | -11,278 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,086 | 16,545 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,608 | 14.75 | 1,779 S |
| 7.625 | 11,989 | 9.875 | 1,503 S |
| 4.5 | 16,571 | 6.75 | 1,836 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 6, 2020 | Nov 13, 2019 | — |
| 00 | Feb 4, 2013 | Nov 12, 2012 | — |
| 00 | Dec 28, 2012 | Oct 12, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33658 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33658 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.