WELL · 42-285-33692 · DISTRICT 2
Sari Unit #1
Lavaca County · Campbell Creek (9700) field · Vertical
Sari Unit #1 (API 42-285-33692) is a plugged well in Lavaca County, plugged September 5, 2019, last operated by Mascot Oil Company.
The RRC has issued one drilling permit, issued February 21, 2013, permitted to 10,200 ft.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Operator of record
Schulenburg, TX · P-5 Y, filed Aug 4, 2025 · 36 permits on file · (214) 679-8687
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mascot Oil Company |
| Production reports | Mascot Oil Companythrough Mar 2016 |
| Latest permit | Mascot Oil CompanyFeb 21, 2013 |
- 10,200
- total depth, ft
- 1
- permits on file
- Feb 21, 2013
- last permit issued
- Apr 23, 2013
- completed
- 0
- cumulative oil, bbl
- 36.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2014 THROUGH Sep 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 2013
- Shut in
- —
- Plugged
- Sep 5, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sari Unit G-2-278994 | Wildcat | Mascot Oil Company | 1 | 0 | 36.2K | Jan 2014 – Sep 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mascot Oil CompanyApr 2014 → Mar 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 756851-99 | Drill | Mascot Oil Company | Feb 14, 2013 | Feb 21, 2013 | Mar 25, 2013 | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-278994 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 366 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,741 | 9,743 | Perforated |
| 9,758 | 9,760 | Perforated |
| 9,765 | 9,773 | Perforated |
| 9,796 | 9,798 | Perforated |
| 9,883 | 9,892 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,932 | 12.25 | 110 S |
| 5.5 | 10,131 | 8.75 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 17, 2016 | Jun 5, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33692 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33692 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533692, documented in the API reference.