WELL · 42-285-33809 · DISTRICT 2

Moulton SWD #1

WaterY

Lavaca County · Eagleville (Eagle Ford-2) field · Injection  · Vertical

Moulton Swd #1 (API 42-285-33809) is a well in Lavaca County operated by Field Site Solutions LLC, completed August 8, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 16, 2014, permitted to 7,200 ft.

It was permitted by High Roller Wells, L.L.C. and has since transferred to Field Site Solutions LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Yegua, Wilcox, Catahoula, Eagle Ford.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 2.52M barrels injected in the 12 months reported through March 2026.

Operator of record

Field Site Solutions LLC

Permitted by High Roller Wells, L.L.C.; the EWA schedule now lists a different operator.

Shiner, TX · P-5 Y, filed Jul 4, 2026 · (361) 935-7039

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleField Site Solutions LLC
Production reportsnone
Latest permitRed Wolf Oil Company, Inc.Apr 16, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
2
permits on file
Apr 16, 2014
last permit issued
Aug 8, 2022
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 8, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moulton SWD O-2-11008Eagleville (Eagle Ford-2)Field Site Solutions, LLC100May 2015 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
781975-98DrillHigh Roller Wells, L.L.C.Apr 15, 2015Apr 16, 2014Apr 30, 20157,200
781975-99DrillRed Wolf Oil Company, Inc.Mar 12, 2014Apr 16, 2014Apr 29, 20156,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-11008————

Formation tops

As filed on W-2/G-1. Subsea from 521 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA - DISPOSAL1,100-579
WilcoxWILCOX - DISPOSAL4,340-3,819
Catahoula——
Eagle FordEAGLE FORD - H2S——
EdwardsEDWARDS - H2S——
FrioFRIO - DISPOSAL——
Vicksburg——

Perforations

Perforated and open-hole intervals.

FromToType
5,6106,260Perforated
5,6106,310Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,91412.25885 S
77,2148.75495 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 10, 2023Aug 8, 2022—
00Oct 21, 2015Oct 20, 2015—
00Oct 19, 2015Oct 19, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.52M
bbl, last 12 reported months
20.1M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111416W-14 DisposalActive20,0002,5505,100–6,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,515,571 · prior 12 6,747,090(-63%)

0500K1M20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28533809, documented in the API reference.